Setting up a delivery-only kitchen or a kitchen that supplies your outlets? Here is what changes when the kitchen is the whole business.
📍 We serve KL, Selangor & Putrajaya.

A cloud kitchen is a delivery-only kitchen with no dining room; a central kitchen prepares food for several outlets and sends it out. Both are fitted out like any commercial kitchen — one-way food flow, stainless fabrication, extract, drainage with a grease trap and hygiene-grade finishes — but the brief changes around dispatch: a rider pickup point, a packing line and, for a central kitchen, cold storage and chilling for food that travels. Extract is often the biggest single services item: ClickBina's ducting guide puts a full system for a small cafe or cloud kitchen at RM6,000 – RM12,000 (market estimate 2026, Klang Valley).
“Cloud kitchen”, “dark kitchen” and “delivery-only kitchen” all describe a kitchen that sells through delivery apps and takeaway, with no seats for customers. It can run one brand or several brands from the same line. A central kitchen is different in purpose: it cooks or prepares food in bulk and supplies other outlets, so it behaves more like a small food factory than a restaurant.
| Point | Cloud kitchen | Central kitchen | Restaurant kitchen |
|---|---|---|---|
| Customers on site | Riders and takeaway only | None; staff and deliveries | Diners in front of house |
| What drives the layout | Order volume per brand and the dispatch point | Batch production, chilling and dispatch | Menu and service style |
| Front-of-house finishes | Minimal | None | Most of the design budget |
| Cold storage | Moderate | Large, often chiller and freezer rooms | Moderate |
| Where it fits | Shoplot, back lane unit or food hub | Light industrial unit or large shoplot | Retail or mall frontage |
Because there is no dining room, most of the money goes behind the pass. Our commercial kitchen setup guide covers the kitchen itself in depth; this page is about what changes when the kitchen is the whole business.
Most of the problems in a delivery kitchen come from the unit, not the design. Before you sign, check the points that decide whether a kitchen can work there at all:
The layout rule is the same as any food premises: product moves one way, from delivery and storage through preparation and cooking to packing and dispatch, and dirty returns never cross clean food. In a cloud kitchen the end of the line is not a pass to a waiter but a packing bench and a pickup shelf. Plan backwards from that point: where orders are checked, bagged and sealed, and where the rider stands.
Multi-brand kitchens add one decision: share stations or split them. Brands with similar cooking methods can share a cookline and differ only at packing. Brands that need different equipment, or that must keep ingredients apart for dietary reasons, need their own prep and cooking zones, each with its own services.
Dispatch is where a cloud kitchen wins or loses on speed. A good pickup zone keeps riders out of the kitchen while letting staff hand over quickly.
A delivery kitchen can cook for long hours at high volume, so extract matters even more than in a small restaurant. The canopy has to cover every cooking appliance, the duct has to reach a discharge point that will not put smoke and smell into neighbouring homes, and the air taken out has to be replaced, or doors slam and the extract stops working properly. Grease in the duct is a fire risk, so access panels for cleaning are part of the design, not an extra.
Our kitchen exhaust and ducting guide explains canopy sizing, duct routes and cleaning, and prices each part of the system.
A cloud kitchen is a food premises like any other. The Food Hygiene Regulations 2009 set the physical rules: impervious, washable floors and walls; coved wall-floor junctions where needed; ceilings that do not shed or grow mould; self-closing doors; hand-wash basins with non-hand-operated taps, separate from food-washing sinks; toilets that do not open straight onto food rooms; and drains fitted with a food trap. Stored food must be kept at least 15 cm from the wall and 20 cm above the floor, which decides your shelving.
Our food premises layout requirements guide goes through the regulations clause by clause, and the grease trap guide covers sizing and access.
A central kitchen adds steps that a cloud kitchen does not have. Food is produced in batches, cooled quickly, portioned, labelled and stored, then loaded for delivery to outlets. That brings its own design points: more cold storage, often separate chiller and freezer rooms; a way to cool cooked food quickly instead of leaving it on a bench; a clean dispatch area with a loading point; and space to wash and store transport containers. Our cold room guide covers chiller and freezer rooms, including dual-temperature pairs for multi-outlet operators.
Two layers of rules meet in a food fit-out. The Food Hygiene Regulations require food premises to be registered and let health officers inspect and order changes. The local council handles the food premises and business permit, the signboard and, for most fit-outs, a renovation approval. A landlord or mall adds its own fit-out rules and nominated contractors on top.
Our commercial renovation permit guide covers the council side in more detail.
These are published ClickBina figures (market estimates, 2026, Klang Valley) for parts of the job. A cloud kitchen has little front-of-house spend, so the kitchen lines below carry most of the budget.
| Item | Indicative price | Source guide |
|---|---|---|
| Full extract system, small cafe or cloud kitchen | RM6,000 – RM12,000 | Kitchen exhaust & ducting guide |
| Full extract system, mid-size restaurant | RM12,000 – RM25,000 | Kitchen exhaust & ducting guide |
| Exhaust hood / canopy | RM1,500 – RM6,000 per hood | Kitchen exhaust & ducting guide |
| Stainless steel cabinet run | RM650 – RM1,000 per ft run | Commercial custom cabinetry guide |
| Under-sink / stainless grease trap, supply & install | RM500 – RM2,000 | Grease trap guide |
| Quick-service restaurant fit-out, whole outlet (for comparison) | RM150 – RM220 per sq ft | Restaurant fit-out cost guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteEquipment, cold rooms, the council's fees and the landlord's charges are separate and depend on your menu, unit and building.
Cloud kitchen and central kitchen fit-outs are quoted case by case. WhatsApp us your job details for a quote: the unit size and location, the menu or brands you plan to run, and what equipment you already have. ClickBina is an experienced KL & Selangor contractor and coordinates the trades on multi-trade jobs. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are indicative Klang Valley market estimates for 2026, not fixed rates or a price for your kitchen.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.