The small room that keeps the office online. Here is how to plan its cooling, power, cabling, fire protection and security during the fit-out.
📍 We serve KL, Selangor & Putrajaya.

A small office server or comms room needs five things: cooling that runs continuously with a backup, clean and protected power, a tidy cable route, fire protection that does not drown the equipment, and a locked door. A domestic-style split unit can cool a small comms cupboard, but it must be sized for the heat, run day and night and ideally be paired with a second unit. Plan the room during the office fit-out, not after: the partitions, ceiling, power and aircon routes are all decided then. ClickBina’s aircon contract guide puts per-visit servicing of a commercial split or cassette at RM80–RM150 a unit.
Wikipedia’s server room article describes a server room as a room, usually air-conditioned, devoted to the continuous operation of computer servers. In a small or mid-size Malaysian office it is often a converted store room holding the network rack, the router and firewall, switches, a small server or storage box, the CCTV recorder and the access-control panel. The equipment is modest, but the business stops when it stops.
The same article lists the design considerations: the location of the room, the air conditioning, fire protection, power, and physical security. This page takes them in that order.
Equipment makes heat, all the time. The Wikipedia article notes that computer equipment is sensitive to heat, humidity and dust, and that most server rooms use close-control or precision air conditioning that manages temperature and humidity within tight limits. For a small comms room, a comfort split unit is common, but it must run continuously, day and night, and it becomes a single point of failure.
As a guide to temperature, Wikipedia’s data center article records that ASHRAE recommended a range of 18.0 °C to 27.0 °C in 2008, and notes that cooling far below the needed level wastes energy. Colder is not better; stable is better.
Most equipment draws air in at the front and pushes it out at the back. In a room with more than one rack, the Wikipedia article describes the hot aisle / cold aisle layout: racks face each other across a cold aisle and back onto a hot aisle, so hot exhaust is not drawn straight into the next rack. In a small room, the practical rules are simpler: point the aircon at the front of the rack, leave space behind it, fit blanking panels in empty rack slots, and keep cables tidy so they do not block the airflow.
Electrical work in the room is a job for a registered electrical contractor. If the office is already short of power, our three-phase upgrade guide explains when a bigger supply is needed.
Every data point in the office runs back to the comms room, so it sits at the centre of the cable plan. Cables arrive through the ceiling, under a raised floor or through trunking. Our office cabling guide compares the routes and reminds you to plan the comms room with ventilation or cooling, power and space for growth. The Wikipedia server room article notes that up-flow aircon units suit retro-fitted rooms where a raised floor is too shallow or absent, while down-flow units that blow through floor grilles suit new rooms designed with a raised floor.
Water and electronics do not mix. The Wikipedia data center article notes that the main equipment room usually avoids a wet-pipe sprinkler system because of the fragile circuit boards, and that gaseous fire suppression is used instead in sensitive rooms. For a small office comms room, the essentials are smoke detection, a room built with fire-rated walls and door where the building requires it, and no combustible storage inside. Any change to the building’s fire systems has to follow the landlord’s and Bomba’s requirements. Our fire-rated door guide explains how rated doors work.
The comms room should be locked and logged. Our office door access guide covers card and biometric access, and notes that the controller cabinet often lives in the server room itself. Keep the server room on its own key rather than on the office master key suite, and keep a list of who can enter.
| Item | What to decide | Why it matters |
|---|---|---|
| Room | Location, size, walls and door | Water, security and fire rating |
| Cooling | Units, redundancy, drain route, alarm | Heat is the most common failure |
| Power | Dedicated circuit, UPS, earthing | Clean power and safe shutdown |
| Cabling | Ceiling, floor or trunking route; rack layout | Airflow and future changes |
| Fire | Detection, suppression, no storage | Protect equipment without water |
| Access | Lock, access control, log | Physical security |
ClickBina does not publish a price for a complete comms room fit-out, because it depends on the equipment, the building and the level of backup. These are the related figures on ClickBina’s own guides.
| Item | Indicative price | Source |
|---|---|---|
| Commercial split or cassette servicing, per visit | RM80–RM150 a unit | Office aircon contract guide |
| Ceiling cassette chemical wash | RM250–RM400 a unit | Office aircon contract guide |
| Fire-rated gypsum board partition | RM35–RM55 per sq ft | Gypsum partition guide |
| Site visit for a wider fit-out | Free | For renovation and fit-out jobs |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteA comms room that runs continuously should be on an aircon maintenance plan; our office aircon contract guide lists server rooms among the mission-critical spaces that suit a comprehensive contract.
Commercial fit-out is not one of ClickBina’s own listed trades, so WhatsApp us your job details for a quote: the office size, the equipment in the rack, and whether the room is new or an existing store room. We reply within the hour. ClickBina handles refurbishment and coordinates the trades on one job, with a flat price, no hidden charges, and a site visit is free.
Pricing note: prices are indicative Klang Valley figures quoted from ClickBina’s published guides; a comms room is priced in writing after the room and the equipment list have been checked.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.