Dripping aircon, running toilets and flickering lights? Here is a practical checklist to keep an office in shape, and who is responsible for what.
📍 We serve KL, Selangor & Putrajaya.

An office maintenance checklist splits the work by frequency: daily and weekly housekeeping, monthly checks of lights, doors, toilets and leaks, quarterly aircon servicing and drain and pump checks, and half-yearly or annual items such as deep cleans, electrical inspections, roof and facade checks and a review of everything the lease makes the tenant responsible for. Write down who owns each item — tenant, landlord or building management — before anything breaks. On ClickBina's published guides, per-visit servicing of a commercial split or cassette aircon runs from RM80 – RM150 a unit, and a monthly maintenance retainer for a single office or building RM500 – RM2,500 (indicative 2026, Klang Valley).
Offices fail in small, expensive ways: an aircon unit that drips on a desk, a toilet that runs all night, a flickering row of lights over the meeting room, a door closer that slams, a slow leak from the pantry sink into the unit below. None of these is a disaster on its own. Together they make staff miserable, waste power and water, and turn into large bills when they are found late.
A checklist turns upkeep into routine. It also makes it obvious which items are yours, which belong to the landlord and which the building management looks after — a question that usually only comes up when something has already broken.
Upkeep of office is the routine work of keeping office premises in working order: cleaning, small repairs, servicing the aircon and other equipment, and replacing what wears out. It is another name for office maintenance, and it is separate from a renovation or a new fit-out. The phrase also appears in company accounts as a cost heading; how a particular cost is treated there is a question for your accountant, not your contractor.
For an office tenant, upkeep usually covers the inside of the unit: cleaning of toilets, pantry and floors; lights, doors, locks, taps and floor traps; the aircon units serving the unit; drains; the unit’s distribution board; and periodic deep cleans and a review of the fit-out. The structure, roof, lifts, fire system and common areas usually sit with the landlord or building management, but the lease decides. The sections below turn that into a daily, monthly, quarterly and annual schedule.
Start with the tenancy agreement. Most office leases make the tenant responsible for the inside of the unit — the fit-out, the aircon units serving it, lights, doors, pantry and any toilets inside the unit — and leave the structure, the roof, common toilets, lifts, the fire system and the risers to the landlord or the building management. Leases vary, so read yours and turn it into a simple ownership column on the checklist. When a repair is disputed, the lease decides, not habit.
ClickBina's planned preventive maintenance guide covers the building-management side for strata property; this page is the office tenant's view.
Most of this sits with the cleaning contractor; ClickBina's office cleaning guide explains how those contracts are scoped.
Quarterly is the usual rhythm for aircon preventive maintenance in commercial premises; ClickBina's office aircon maintenance guide explains what a quarterly service covers. Around the same time:
| Item | How often | Usually owned by |
|---|---|---|
| Cleaning, pantry and toilets | Daily / weekly | Tenant (cleaning contractor) |
| Lights, doors, locks, taps and floor traps | Monthly | Tenant, inside the unit |
| Aircon units serving the unit | Monthly look, quarterly service | Tenant, unless the lease says otherwise |
| Pantry and toilet drains inside the unit | Quarterly | Tenant |
| Distribution board and circuits | Quarterly visual, annual inspection | Tenant for the unit's board |
| Carpets, upholstery, grilles | Half-yearly / annual | Tenant |
| Roof, facade, risers, lifts, fire system, common toilets | As scheduled by the building | Landlord or building management |
Keep a simple log: the date, what was checked, what was found, and what was done. Ask every contractor for a service report. Records help in three ways: they show a landlord that the tenant has looked after the unit, they reveal patterns (the same aircon unit dripping every two months), and they make the end-of-lease conversation about reinstatement far easier. ClickBina's office reinstatement guide explains what is usually handed back.
A small office with a few aircon units and one pantry can often manage with a checklist, a cleaning contractor and ad-hoc calls for repairs. Larger offices, several floors or several sites are usually easier on a contract: one party follows the schedule, keeps the records and answers breakdown calls within an agreed time. Whichever you choose, the checklist is the scope. Review it once a year, and again whenever the layout, the headcount or the lease changes, because a checklist written for the old office will miss the new pantry or the extra meeting rooms.
These published figures from ClickBina's guides show the usual building blocks (indicative 2026, Klang Valley):
| Item | Indicative price | Source guide |
|---|---|---|
| Commercial split or cassette aircon, per-visit service | RM80 – RM150 a unit | Office aircon maintenance guide |
| Cassette aircon chemical wash | RM250 – RM400 a unit | Office aircon maintenance guide |
| Ad-hoc / on-call maintenance visit | RM120 – RM400 per visit | Planned preventive maintenance guide |
| Monthly retainer, single office or building | RM500 – RM2,500 per month | Planned preventive maintenance guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteParts, replacements and repairs found during checks are quoted separately.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. For office maintenance, WhatsApp us your job details for a quote: the office size, the number of aircon units and toilets, and anything that needs attention now. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free. If an aircon unit is misbehaving, an aircon diagnostic runs RM120–RM400.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates. Frequencies are common practice, not legal requirements; your lease and the building's own rules come first.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.