Sandwich Panel Partitions: PU vs PIR vs EPS vs Rockwool
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏭 Commercial & Industrial

Sandwich Panel Partitions
PU vs PIR vs EPS vs Rockwool (2026)

Building a site office, cold room or factory partition from insulated panels? How the four core types compare on fire, heat and sound, and what to ask before you order.

📍 We serve KL, Selangor & Putrajaya.

Stacked sandwich panels showing EPS, PU, PIR and rockwool cores beside a panel site office

A sandwich panel is two thin metal skins bonded to an insulating core, and the core decides almost everything: EPS (expanded polystyrene) is the cheapest and lightest, PU and PIR foams insulate better for the thickness, and rockwool (mineral wool) is chosen where fire performance matters most. Foam cores burn and give off toxic smoke in a real fire, which is why the fire rating the building needs, not the price, should drive the choice for offices, factories, food premises and anything near an escape route. Panels are quoted per job once the core, thickness, height and approvals are known; WhatsApp us your job details for a quote.

What a sandwich panel is

Wikipedia’s entry on sandwich panels describes the principle: a low-density core, such as PIR, mineral wool or extruded polystyrene, with a thin skin bonded to each side. The skins take the bending loads and the core takes the shear, a little like the flanges and web of a steel beam, so a panel can be stiff and light at the same time.

In buildings they are used as prefabricated walls and roofs for factories, warehouses, site offices, clean rooms and cold rooms. Our cold room installation guide describes insulated panels that lock together with cam locks and are sealed at every joint, which is the same family of product used for partitions.

The four common cores

CoreWhat it isStrengthsWeak spots
EPS (expanded polystyrene)Expanded plastic beads fused into a boardCheapest, lightest, good insulatorCombustible; melts and drips in fire
PU (polyurethane foam)Rigid foam injected or laminated between skinsBetter insulation for the thickness; common in cold roomsCombustible; toxic smoke in fire
PIR (polyisocyanurate foam)A tougher cousin of PU foamGood insulation; better small-scale fire test results than PUStill a foam; fire toxicity concerns in real fires
Rockwool (mineral wool)Spun stone fibres bonded into a slabFire resistance; good sound absorptionHeavier; must be kept dry; skins must be well sealed

Skins are usually coated steel. The thickness of the panel, the core density and the joint design all change how it performs, so two panels called by the same core name can behave quite differently.

Fire: the question to ask first

Foam cores burn. Wikipedia’s entry on polyisocyanurate notes that PIR is sometimes described as fire retardant on the strength of small-scale tests that do not reflect all the hazards of a real fire, and that a study of insulating materials found most fire deaths come from inhaling toxic products, with hydrogen cyanide a significant contributor for PIR and PU foams. The same entry records that the public inquiry into the Grenfell Tower fire found a PIR insulation product was a contributory factor in the rapid spread of that fire.

Mineral wool is the opposite case. Wikipedia’s entry notes that the fire resistance of stone wool makes it common where passive fire protection is required. For partitions near escape routes, in food premises or in any building where the approvals specify a fire rating, the rated panel system is not optional.

⚠️ Do not choose a panel core on price alone for an office, factory, shop or warehouse. Ask the architect, engineer or the building’s fire consultant what fire performance the partition needs, and ask the supplier for test evidence for the complete panel system, not just the core.

Heat insulation

All four cores insulate well compared with brick or board, which is why panels are used for cold rooms and hot factory offices. Wikipedia’s polystyrene entry gives typical EPS board thermal conductivity of 0.032 to 0.038 W/(m·K) depending on density, and its mineral wool entry gives 0.030 to 0.045 W/(m·K); foam cores such as PU and PIR are generally chosen where the best insulation per thickness is wanted. The lower the number, the better the insulation.

In a hot metal-roofed factory, insulating the roof usually matters more than the partitions; our factory heat reduction guide explains the order of work.

Sound and privacy

Sandwich panels are light, and light walls let sound through more easily than heavy ones. Mineral wool cores absorb sound better than foam cores, but for a quiet meeting room or manager’s office next to a noisy production floor, the joints, the ceiling junction and the doors matter as much as the core. Gaps above a partition that stops at the false ceiling let noise straight over the top.

Where each core is usually used

UseCommon choiceWhy
Cold rooms and chillersPU or PIRBest insulation per thickness, sealed joints
Factory site office, guard houseEPS or PIR, rockwool near hazardsLow cost and fast; fire rating decides
Partitions on escape routes or fire compartmentsRockwool (rated system)Fire resistance required by the approvals
Food processing and clean areasPIR or PU with hygienic skins; rockwool where fire-ratedWashable skins, sealed joints
Rooftop plant roomsRockwool or PIRHeat, weather and fire considerations

How panel partitions are installed

  1. Floor and ceiling channels are fixed in line; the floor must be level along the partition.
  2. Panels are stood in the channels and locked or tongue-and-grooved together.
  3. Joints are sealed; cut edges of foam or wool are covered so the core is not exposed.
  4. Door frames, windows and services openings are formed with the correct trims.
  5. Where a fire rating applies, every joint, penetration and door must follow the rated system.

Cables and pipes through a panel are a common weak point, both for fire and for pests nesting in exposed foam. Ask how service penetrations will be sealed.

Sandwich panels vs drywall or brick

For an office inside an air-conditioned building, a drywall partition with the right boards is often the better finish and can be fire-rated. Panels win on speed, insulation and washability, and in hot or damp industrial spaces where board would suffer. Brick or block is still chosen for heavy-duty or external walls. In a building with an aluminium composite façade, the cladding is also a sandwich panel; our ACP cladding guide covers that separately.

Approvals and paperwork

New partitions in commercial and industrial buildings can need building management consent and, for larger works, council and fire approvals. Our commercial renovation permit guide explains which approvals a commercial renovation can need. Doors in fire-rated walls must be rated too; see our fire-rated door guide.

What a quotation should state

  • Core type, panel thickness and core density, and the skin material and coating.
  • The fire performance claimed and the test evidence for the complete system.
  • Heights, lengths, doors, windows and trims, and how the ceiling junction is closed.
  • How cut edges and service penetrations are sealed.
  • Who obtains management, council or fire approvals, if needed.

The site does not publish a sandwich panel price, because the core, thickness, height, doors and approvals change it so much; ask for these items to be priced as separate lines.

How ClickBina helps

WhatsApp us your job details for a quote: the building type, what the partition is for, the length and height, and any fire rating or approval you already know about. We reply within the hour, and the price we agree is a flat price with no hidden charges. If the partitions are part of a larger renovation, we handle whole-house refurbishment and coordinate the trades; a site visit is free. See our renovation page.

Sources & methodology

How we price: the only RM figure on this page is A site visit is free. Panel partitions are quoted per job once the core, thickness and approvals are known.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What is the difference between PU, PIR, EPS and rockwool sandwich panels?
They differ in the core. EPS is cheapest and lightest; PU and PIR foams insulate better for the thickness; rockwool (mineral wool) is chosen where fire resistance matters most.
Which sandwich panel is best for fire safety?
Mineral wool (rockwool) cores, in a tested and rated system. Foam cores burn and give off toxic smoke in a real fire, even when small-scale tests look good.
Is PIR fire resistant?
PIR performs better than PU in some small-scale tests, but Wikipedia notes these do not reflect all real-fire hazards, and PIR foam releases toxic gases when it burns.
Which panel is best for a cold room?
PU or PIR panels are the usual choice because they give the best insulation for the thickness, with sealed joints.
Are sandwich panel partitions soundproof?
Not especially; they are light. Mineral wool cores absorb more sound, but joints, the ceiling junction and doors decide how much noise gets through.
Do I need approval for sandwich panel partitions?
In commercial and industrial buildings, often: building management, and for larger works council and fire approvals. Check before ordering.
How much do sandwich panel partitions cost?
There is no published rate on this site, because the core, thickness, height, doors and approvals change the price. WhatsApp us your job details for a quote.

Get a Quote