Turning a badminton hall or an empty tennis court into pickleball, or adding a court at home? Here is what the official size means for your space, which surfaces work, and what trips projects up.
📍 We serve KL, Selangor & Putrajaya.

A pickleball court is 20 by 44 feet (6.1 by 13.4 m), the same size as a doubles badminton court, with a net 36 inches high at the sidelines and 34 inches in the centre. That makes badminton halls and under-used tennis courts the usual starting point for conversions. What decides the result is the base, drainage, lighting and, above all for pickleball, noise near homes. ClickBina does not publish a price for court construction; each project is quoted after a site visit.
Pickleball is a paddle sport for two or four players, played with a solid paddle and a perforated plastic ball over a low net. It is easy to start and social, and players of very different ages can share a game, which is why it has spread so quickly. Malaysia is not a side note here: by player registrations on the DUPR rating system, Malaysia ranks just behind the United States, Canada, Australia and the United Kingdom.
For owners that creates three kinds of request: a condo or JMB wanting to turn an under-used tennis or badminton court into pickleball, a sports centre or warehouse operator adding courts, and a landed homeowner with enough garden or car-porch space for a private court. The good news is that a pickleball court is small. The hard part is the same as every court: the base, the drainage, the lighting and, uniquely for pickleball, the noise.
The official court is the same for singles and doubles. According to USA Pickleball and the published rules summarised on Wikipedia:
| Element | Dimension | Note |
|---|---|---|
| Court (inside the lines) | 20 ft × 44 ft (6.1 m × 13.4 m) | Same for singles and doubles |
| Net height at the sidelines | 36 in (0.91 m) | The net sags to the centre |
| Net height at the centre | 34 in (0.86 m) | Lower than a tennis net |
| Non-volley zone (“the kitchen”) | 7 ft (2.1 m) from the net on each side | No volleying inside it |
| Centre line | From each baseline to the non-volley line | Splits the service courts |
That 20 by 44 feet footprint is the same size as a doubles badminton court, which is why so many conversions start in badminton halls. Around the lines, players also need clear space to move and retrieve the ball; the amount depends on whether it is a casual residential court or a competition venue, so ask your designer to state the total playing area and the clearances to fences, walls and columns in writing.
Work from the outside in. Measure the whole available area, subtract walls, columns, drains, trees and any access path that must stay open, and only then see how many court footprints plus clear space fit. For multi-court sites, the spacing between courts and a barrier or netting between them matter as much as the courts themselves, because balls roll into the next game.
Because the footprint matches a doubles badminton court, a badminton hall can often host pickleball with new lines and a different net, without moving walls. The practical questions are:
For everything above head height in a converted hall (roof leaks, structure, lighting grids and ventilation), the badminton court construction guide covers the building side in detail and applies equally to pickleball.
A single tennis court can be converted into multiple pickleball courts, which is attractive for condos and clubs where the tennis court sits empty. There are two routes. Shared lines keep tennis playable and add pickleball lines in a contrasting colour with portable nets; it is cheap but the extra lines can confuse players of both games. Full conversion removes the tennis net and lines and lays out dedicated pickleball courts with permanent posts and dividing netting.
Either way, an old tennis court is usually due for surface repair: cracks, ponding and faded coating should be fixed before new lines go down, or the new lines crack along the old faults. For a strata property, a conversion of common property is a management corporation or JMB decision, so the resolution and budget come before the contractor.
Tournament play usually uses a specialised polyurethane sport surface, but courts are often set up on concrete, artificial turf and indoor basketball courts. The realistic options:
| Surface | What it is | Suits | Watch out for |
|---|---|---|---|
| Acrylic or polyurethane sport coating on concrete or asphalt | Layered sports coating with textured finish and painted lines | Outdoor and covered courts | Base must be sound and drain; cracks telegraph through |
| Coated concrete | Concrete slab with a sports-grade coating | Budget courts, private homes | Hard underfoot; grip must be specified |
| Indoor sports floor or PVC sports mat | Existing hall floor or roll-out mat | Halls and badminton conversions | Check ball bounce and wear on soft mats |
| Artificial turf | Synthetic grass with lines | Casual multi-use areas | Bounce is less consistent than a hard court |
Whatever you choose, ask for the surface system by product name, the number of coats or layers and the line paint in the quotation, so what arrives on site is what was priced.
USA Pickleball recommends orienting outdoor courts north–south so players are not looking straight into the rising or setting sun, a common safety hazard. In Malaysia two other things matter just as much:
If the court sits over a slab with a room or car park below (a podium or rooftop), waterproofing comes before any sports coating; see the concrete waterproofing guide.
Good lighting helps players track the ball, reduces eye strain and gives even playing conditions across the whole court. USA Pickleball’s advice is to aim for the most uniform, glare-free light the budget allows. Ask for the illuminance level and uniformity the design achieves, in writing, and make sure the fittings are placed so players do not look into them on a lob. The lighting design guide explains how light levels and glare are specified.
Fencing keeps balls in and passers-by out; a court beside a road, a car park or a neighbour needs it most. Chain-link or mesh panels with a windbreak screen are common. For fence types and how they are priced, see the fencing cost guide.
This is where pickleball differs from badminton. A hard paddle hitting a hard ball makes a sharp popping sound, and in other countries the constant sound has caused real conflict between court owners and nearby residents. For a condo court under bedroom windows or a private court next to a terrace neighbour, think about noise before you build:
Approvals depend on the site. A new roof or shade structure, floodlight poles or a boundary fence on a landed lot may need council approval; a court on strata common property needs the JMB or MC’s decision; a commercial hall needs the premises to be approved for that use. Check with your council and management before work starts rather than after.
| Line in the quotation | What it should state |
|---|---|
| Site preparation and base | Repairs to cracks, levelling, falls and drainage |
| Surface system | Product name, layers or coats, colour and texture |
| Line marking | Colour, and whether other sports’ lines stay or go |
| Posts and nets | Permanent posts or portable nets, and the number of courts |
| Fencing and dividers | Height and type as designed, windbreak screens, gates |
| Lighting | Fittings, illuminance and uniformity, and who does the electrical work |
| Shade or roof | Structure, footings, clear height and drainage |
Futsal and badminton projects face many of the same issues; the futsal court construction guide is useful for outdoor bases, drainage and floodlighting.
ClickBina is an experienced KL & Selangor contractor that coordinates trades, so the building works around a court (roof and leak repairs in a converted hall, drainage, slab repairs, and electrical and fencing coordination) can be planned together. Specialist sports surfacing is quoted per project. The price is flat, with no hidden charges, and a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. WhatsApp us your job details for a quote and we reply within the hour.
Court dimensions, net heights, the non-volley line, surfaces, ball design, noise, tennis conversion and the DUPR player ranking are from the Wikipedia article on pickleball and USA Pickleball’s introduction to the sport. Orientation and markings are from USA Pickleball’s court construction page; lighting principles from its court lighting page; and shade from its court shading page. These are American sources; Malaysian approval requirements depend on your council and building. ClickBina does not publish a price for court construction.