Your lease is ending and the landlord wants the unit back as it was. Here is what reinstatement covers for a shop or restaurant, and how to protect your deposit.
📍 We serve KL, Selangor & Putrajaya.

At the end of a shop or restaurant lease, the reinstatement clause usually requires you to remove your fit-out, signage and alterations and hand the unit back in its original or specified condition, at your cost; if you do not, the landlord deducts the work from your deposit. A retail strip-out is mostly partitions, ceilings, flooring, shopfront and signage. A restaurant adds the kitchen: exhaust hood and ducting, grease trap, gas supply, drainage and wet-area finishes, each needing the right trade. Start from the lease and the condition record, get the landlord's reinstatement scope in writing, and allow time inside the notice period.
ClickBina's commercial tenancy guide describes the reinstatement clause as standard in commercial leases: the tenant removes all fit-out, signage and alterations and returns the unit to its original condition, or the landlord's specified condition, at the end of the tenancy and at the tenant's cost. Failure to reinstate entitles the landlord to deduct the cost from the deposit or sue for the balance.
The idea is old. Wikipedia's dilapidation entry traces it in English law as the disrepair a tenant is usually liable for when the tenant has agreed to give up the premises in good repair. In practice in Malaysia, what matters is the wording of your lease and any condition record made at the start.
| Item | Retail shop | Restaurant or cafe |
|---|---|---|
| Partitions, feature walls, ceilings | Usually removed | Usually removed |
| Flooring laid over the landlord's floor | Removed, floor made good | Removed, including wet-area screeds |
| Shopfront, signage, lightbox | Removed, openings made good | Removed, openings made good |
| Electrical sub-circuits and lighting | Made safe and capped back to the board | Made safe, plus kitchen power points |
| Plumbing points | Few, capped | Sinks, dishwasher, floor traps capped and sealed |
| Exhaust hood and ducting | Not applicable | Removed; roof or wall openings sealed |
| Grease trap | Not applicable | Emptied, cleaned; removed or left as the lease says |
| Gas supply | Not applicable | Disconnected and made safe by a gas contractor |
Some landlords want everything out to bare shell; others want the kitchen services left for the next F&B tenant. Never assume: get the landlord's list in writing before pricing the job.
The commercial tenancy guide recommends recording the unit's condition before any fit-out, signed by both parties. If that was done, it is now your best evidence of what 'original condition' means.
Planning the budget? The Office Reinstatement Cost Calculator multiplies your office area by the per-sq-ft range for the reinstatement scope, so you can see the range before anyone quotes.
A restaurant kitchen is not demolition work alone. The hood and ducting are heavy, greasy and often run through ceilings or out through walls and roofs, and every opening they leave has to be sealed weathertight. ClickBina's kitchen exhaust ducting guide explains how these systems are built, which helps when planning how they come out.
Gas lines must be disconnected, capped and made safe by a competent gas contractor before anything nearby is cut or hacked. Kitchen power points on dedicated circuits go back to the distribution board and are made safe. Floor traps, sink wastes and the grease line are capped so smells and pests cannot come back up.
Wikipedia's grease trap entry describes it as a plumbing device that intercepts most greases and solids before they enter the wastewater system. At hand-back it will be full of exactly that. Whether the lease says to remove it or leave it, it should be pumped out and cleaned first, and the landlord will expect the drain line downstream to be clear.
ClickBina's grease trap guide covers cleaning and pump-out, including in-ground interceptors.
Removal is only half of reinstatement. Where partitions come out, the floor and walls need patching; where flooring comes up, the landlord's floor is cleaned or screeded; where a ceiling comes down, the landlord's grid or slab is left clean and complete. Openings for ducts, signage and cables are sealed and finished to match. Painting to the landlord's colour is normally the last step. Leave the unit swept, the drains flowing and the keys, access cards and any remote controls ready to hand over at the joint inspection.
Mall units come with the most rules: works only at night or outside trading hours, hoarding across the shopfront, loading bay bookings, fire system isolation permits and a mall inspection before the deposit is released. Street shoplots are simpler, but the landlord is often a private owner who inspects in person, so agreeing the scope in writing matters even more.
Keep dated records of the finished unit at the joint inspection. It protects your deposit if the landlord later disputes the condition.
Indicative Klang Valley figures from ClickBina's published guides (2026). The per-square-foot rates are ClickBina's office benchmark; a restaurant kitchen adds the specialist items below.
| Item | Indicative price | Source guide |
|---|---|---|
| Light make-good (office benchmark) | RM3 – RM6 per sq ft | Office reinstatement guide |
| Standard reinstatement (office benchmark) | RM6 – RM12 per sq ft | Office reinstatement guide |
| Heavy strip-out to bare shell (office benchmark) | RM12 – RM20+ per sq ft | Office reinstatement guide |
| Hack non-structural brick partition, with disposal | RM10 – RM25 per sq ft | Demolition and strip-out guide |
| Debris disposal, per bin or load | RM400 – RM1,200 | Demolition and strip-out guide |
| In-ground grease interceptor pump-out | RM400 – RM1,200+ | Grease trap guide |
| Grease-duct cleaning, per visit | RM600 – RM2,500 | Kitchen exhaust ducting guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteGas disconnection, kitchen equipment removal and mall permit fees are quoted separately, because they depend on the landlord's scope and the building's rules.
WhatsApp us your job details for a quote: the unit size, whether it is a mall unit or a shoplot, what was built during the fit-out, the landlord's reinstatement requirements and your handover date. ClickBina is an experienced KL & Selangor contractor for trade coordination, so the strip-out, making good and painting can be organised as one job with specialist trades brought in where the kitchen needs them. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; the per-square-foot rates are an office benchmark, and all figures are indicative Klang Valley ranges for 2026, not a quote for your unit.