New Roller Shutter: Aluminium vs Steel, Manual vs Electric
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏪 Shop Fit-Out

Choosing a New Roller Shutter
Aluminium vs Steel, Manual vs Electric (2026)

Which curtain, which material and which drive for a shop, mall unit or warehouse opening.

📍 We serve KL, Selangor & Putrajaya.

Looking up at a half-raised perforated aluminium roller shutter with amber light through the holes

For a new roller shutter, choose the curtain material for the location, the curtain type for how much the shop must be seen after hours, and the drive for how often and how easily it will be opened. Galvanised or zincalume steel is the strong, economical default for street shoplots; aluminium is lighter and does not rust, which suits wide openings, malls and damp or coastal sites; perforated, grille and see-through curtains keep the display visible at night. Manual spring-balanced shutters suit small openings used once or twice a day; electric shutters suit heavy, wide or frequently used openings, and need a proper power supply and a manual release. ClickBina does not publish a shutter price because each one is made to measure; a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

New shutter or repair first?

Before you buy, make sure you actually need a new shutter. A shutter that is heavy, noisy or stops part-way is often a repair: lost spring balance, bent guides or a motor setting. ClickBina's roller shutter repair guide explains how to tell a repair from a replacement and what a technician should check first. A new shutter makes sense when the curtain is buckled, the guides and barrel are worn out, the opening is being changed, or the premises is being fitted out for a new business that needs a different kind of frontage.

It also helps to decide what job the shutter does. On most Malaysian street shoplots the shutter is the night security layer in front of a glass or folding frontage, not a replacement for it. ClickBina's shopfront options guide explains how the glass, the folding door and the shutter share the work.

Galvanised steel, zincalume, aluminium or stainless

The curtain material decides the weight, the strength and how the shutter ages. The common choices:

Curtain materialStrengthsWeaknessesTypical use
Galvanised steelStrong, economical, widely availableHeavy; can rust where the coating is scratched or cutStreet shoplots, stores, back doors
Zincalume (aluminium-zinc coated) steelStrong, with a coating that generally resists weather better than plain galvanisingStill steel underneath; cut edges and dents need careShoplots and warehouses that want steel strength
AluminiumLight, does not rust, neat finish, easier to motorise on wide openingsDents more easily; usually costs more than steelMalls, wide frontages, damp or coastal sites
Stainless steelHighest resistance to corrosion, premium lookThe most expensive optionFood premises and frontages where appearance matters

Two practical points. A heavier curtain needs a stronger spring or a bigger motor and stronger fixings, so the material choice affects the whole shutter, not just the slats. And on a coastal or very damp site, the coating and how the cut edges are treated matter more than the brochure description.

Solid, perforated, grille or see-through curtain

The curtain type decides what people see when the shop is closed. A solid curtain gives the most security and privacy and hides the display completely. A perforated curtain has small holes punched through the slats: the display and the lights stay visible and air can pass through, but it is still a continuous metal curtain. A grille curtain is made of linked bars or links, and is common in malls where the display must stay visible and the landlord controls the look. A see-through curtain uses clear polycarbonate panels in the slats for the most visibility, at the cost of scratches over time.

Insulated shutters with a foam-filled double skin are a separate family, used where heat, noise or a cold room matter more than the look. They are heavier, and the repair guide notes that their sections are harder to source than plain slats, so keep the shutter's make and model on file.

Manual or electric

A manual shutter is balanced by springs inside the barrel and lifted by hand, sometimes with a pole or a hand chain. An electric shutter is driven by a motor with a wall switch, key switch or remote. The choice is mostly about size, weight and how often the shutter is used:

Manual (spring-balanced)Electric (motorised)
Best forSmaller openings opened once or twice a dayWide or heavy openings, frequent use, high openings
Daily effortStaff lift and lower it by handPush-button or remote
Power supplyNone neededA proper supply with protection and isolation
In a power cutWorks as normalNeeds a working manual release
What wearsSprings, bearings, guidesSprings or balance, motor, limits, controls, guides
SecurityLocked at the bottom railMotor holds the curtain; bottom locks can still be added

For a small shop opened in the morning and closed at night, a good manual shutter is simple and reliable. Once the opening is wide, the curtain is heavy, staff struggle to lift it, or it is opened many times a day, an electric shutter saves effort and wear on people and on the curtain.

Electric shutter motors in plain terms

Electric shutters use one of two broad motor arrangements. A tubular motor sits inside the barrel and is neat and quiet; it is common on shopfront and domestic shutters. An external motor sits beside the barrel and drives it through gears or a chain; it is common on heavier and industrial shutters and usually has a hand chain or crank for manual operation. Either way the motor has limits that tell it where to stop, and a control side: wall switch, key switch, remote receiver and any safety devices.

Ask what the motor is sized for, how the manual override works, whether the motor and control box are reachable for servicing, and whether parts are locally available. A motor that is too small for the curtain will overheat and fail early, which is one of the common faults the repair guide describes.

Converting a manual shutter to electric

Many shop owners ask whether an existing manual shutter can be motorised instead of replaced. It often can, if the shutter is in good condition. The curtain must run freely, the guides must be straight and firmly fixed, and there must be room beside or inside the barrel for the motor. The springs may need adjusting or changing because the motor now does part of the balancing work.

A conversion is not worth it when the curtain is buckled, the guides are distorted or the barrel is worn, because the motor will be fighting a shutter that already jams. In that case a new shutter, specified as electric from the start, is usually the better decision. The new supply for the motor is electrical work: in Malaysia it must be connected by a competent person registered with Suruhanjaya Tenaga (the Energy Commission), and many older shoplots need a proper circuit rather than a spur from the nearest socket. The electrical and plumbing service page covers that side of the work.

Remotes, switches and safety devices

The simplest control is a wall switch inside the premises. A key switch outside lets staff open the shutter before they are inside. Remotes are convenient, but a lost remote is a security risk, so keep a record of how many exist and who holds them. On a busy frontage or a loading opening where people or vehicles pass underneath, ask about obstruction sensors or safety edges that stop the curtain if something is in the way, and make sure they are tested rather than assumed to work. Nobody should stand or pass under a moving shutter.

Power cuts, the manual release and escape routes

Every electric shutter needs a way to open it without power, and the people who work there should be shown how. If the shutter is the only way out of the premises, the manual release must be reachable without a ladder. Where a shutter sits on or near a means of escape, or forms part of a building's fire compartment, the building's fire strategy comes first and the decision belongs to the fire consultant and the authorities, not to the shutter seller. A shutter that must close automatically in a fire is a different product altogether: see ClickBina's fire shutter guide.

Security: locks, bottom rails and alarms

The shutter's security depends on more than the slat. The bottom rail, the locks and the way the guides are fixed are where forced entry is usually attempted. Ask for locks at the bottom rail into the floor or the guides, guides fixed firmly into the structure, and a curtain that cannot easily be lifted from the bottom. Many shops add an alarm contact on the shutter; ClickBina's retail shop CCTV and alarm guide covers sensors on doors and shutters for the hours the shop is closed. Mall shutters and grilles often have to follow the landlord's design rules, so check the fit-out guidelines before ordering.

What drives the price of a new shutter

ClickBina does not publish a headline shutter price, because every shutter is made to measure and the figure depends on these drivers:

  • Opening width and height, which set the curtain area and the barrel size.
  • Curtain material and thickness: galvanised or zincalume steel, aluminium or stainless.
  • Curtain type: solid, perforated, grille, see-through or insulated.
  • Drive: manual springs, or an electric motor with its controls and manual override.
  • The opening itself: headroom for the roll, how the guides and barrel can be fixed, and any making good.
  • Access: ground-floor frontage, mall night works, or a high industrial opening that needs access equipment.
  • Removal and disposal of the old shutter, and the electrical supply for an electric one.

When comparing quotes, check that each one names the material, the curtain type, the motor and control arrangement, the manual release, the locks, the removal of the old shutter and the electrical connection. A cheaper quote often leaves one of those out.

What to send for a quote

  • The premises type: street shoplot, mall unit, warehouse, factory or house.
  • The opening width and height, and whether there is an old shutter to remove.
  • Manual or electric, and how many times a day it will be opened.
  • The curtain you want: solid, perforated, grille or see-through, and any landlord rules.
  • Whether a power point is already near the opening.

How ClickBina can help

ClickBina handles commercial renovation and shop fit-out works in KL and Selangor and coordinates the trades around a new frontage: the shutter, the glass or folding door, the signboard, the electrical supply and the making good, so they are measured and scheduled together. For the shutter itself, WhatsApp us your job details for a quote. We reply within the hour, the price we agree is a flat price with no hidden charges, and a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. The shop fit-out service page covers the wider frontage work.

Sources & methodology

  • ClickBina roller shutter repair guide — parts of a shutter, types, motors, manual release and power supply.
  • ClickBina shopfront options guide — how the shutter works with glass and folding frontages.
  • ClickBina retail shop CCTV and alarm guide — shutter alarm contacts.
  • ClickBina fire shutter guide — where a fire-rated shutter is a different product.

Methodology: this page gives no shutter price because ClickBina has not published one; each shutter is quoted after measuring the opening. The only figure is a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

Got a job in mind?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Which is better for a roller shutter, aluminium or steel?
Galvanised or zincalume steel is stronger and cheaper for street shoplots; aluminium is lighter and does not rust, which suits wide openings, malls and damp or coastal sites.
How much does a new roller shutter cost in Malaysia?
It depends on the opening size, material, curtain type and whether it is electric. ClickBina quotes each shutter after measuring; a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
Can a manual roller shutter be converted to electric?
Often yes, if the curtain runs freely, the guides are straight and there is room for the motor. A buckled curtain or worn barrel usually means a new electric shutter is the better choice.
What is a perforated roller shutter?
A metal curtain with small holes punched through the slats, so the display and lights stay visible after closing.
What happens to an electric shutter in a power cut?
It needs a manual release or override, and staff should know how to use it, especially if it is an exit.
Who connects the power for an electric shutter?
A competent person registered with Suruhanjaya Tenaga, on a proper circuit with protection and isolation.
What should I send for a quote?
The premises type, the opening size, manual or electric, the curtain type, any landlord rules and whether power is nearby.

Get a Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides