Rental Unit Refurbishment Cost
in Malaysia (2026)

Realistic 2026 Klang Valley RM cost ranges for every scope of rental unit refurbishment — from a basic turnover clean to a full mid-range upgrade — with ROI analysis.

📍 We serve KL, Selangor & Putrajaya.

Painter rolling fresh white paint onto a wall inside an empty rental unit
Refurbishing a rental unit in the Klang Valley costs approximately RM3,000–RM5,500 for a basic condo between-tenancy turnover, or RM18,000–RM40,000+ for a full mid-range refurbishment. The key cost drivers are unit size, scope of painting, extent of repairs, and whether fixtures are replaced or retained.
📐 Free tool: Try our renovation cost calculator for an instant estimate — no sign-up needed.

All prices are indicative 2026 Klang Valley ranges. Actual cost depends on unit condition, size and scope — WhatsApp ClickBina for a quote or use our renovation cost calculator →.

Refurbishment tiers and cost ranges

Landlord refurbishment scopes fall into three tiers, each with different investment levels and returns:

TierWhat’s includedCondo (700–1,000 sq ft)Terrace house
Basic turnoverTouch-up repaint, deep clean, aircon service, minor repairsRM3,000 – RM5,500RM5,000 – RM9,000
Standard refurbFull repaint, deep clean, all repairs resolved, fixture replacementsRM6,000 – RM12,000RM10,000 – RM20,000
Full mid-range upgradeRepaint, kitchen refresh, bathroom retile/re-seal, flooring, fixtures, deep cleanRM18,000 – RM40,000RM30,000 – RM70,000

Have a renovation or repair question too?

This guide covers the legal side — if you also need a contractor for repairs, waterproofing, or renovation work, feel free to ask, no obligation.

💬 Ask ClickBina on WhatsApp
No obligationFriendly, no-pressure adviceKL & Selangor based team

Most Klang Valley landlords refurbishing between tenants fall in the standard refurb tier — a full repaint, all defects cleared, and any worn fixtures replaced. The full mid-range upgrade makes sense when the unit has not been refurbished in 7–10 years or the kitchen and bathrooms are visibly dated.

Item-by-item cost breakdown

Here are indicative 2026 Klang Valley RM ranges for each refurbishment line item:

ItemScopeIndicative cost (Klang Valley)
Repaint — condo full2 coats, walls + ceilings, 700–1,000 sq ftRM1,800 – RM3,500
Repaint — touch-up onlyPatches, scuffs, stained areasRM400 – RM900
Repaint — terrace house2 coats, walls + ceilings, 1,500–2,000 sq ftRM3,500 – RM6,000
Professional deep clean — condoAll rooms, grout, inside cabinets, bathroomsRM300 – RM700
Aircon service (per unit)Filter clean, drain check, gas top-up if neededRM60 – RM120
Plumbing repairs (per item)Dripping tap, running cistern, blocked drainRM80 – RM350
Electrical repairs (per item)Dead socket, faulty switch, tripping MCBRM80 – RM400
Door/window repairsHinge, handle, lock, grilleRM80 – RM300
Kitchen cabinet respray/refaceCabinet doors only, not full replacementRM800 – RM2,500
Kitchen full upgradeNew cabinets, worktop, sink, tap, tilingRM8,000 – RM25,000
Bathroom re-seal & refreshNew silicone, grout touch-up, toilet seat, tapRM500 – RM1,500
Bathroom full retileHack and retile walls + floor, waterproofing, fittingsRM6,000 – RM15,000
Vinyl plank flooring (whole unit)Supply and install, condo 700–1,000 sq ftRM4,000 – RM9,000
Toilet seat replacementStandard fittingRM80 – RM200
Instant water heater replacementSupply and installRM350 – RM650
Tap replacement (per tap)Basin, kitchen or showerRM120 – RM350

Scope comparison: basic turnover vs standard refurb vs full upgrade

Choosing the right scope requires matching investment to likely return. This comparison table makes the trade-offs explicit:

Scope elementBasic turnoverStandard refurbFull upgrade
PaintingTouch-up patches onlyFull 2-coat repaintFull repaint + trim
CleaningProfessional deep cleanProfessional deep cleanProfessional deep clean
Plumbing repairsCritical only (leaks)All defects clearedAll defects + upgrades
Electrical repairsCritical only (dead sockets)All defects clearedAll + extra circuits if needed
KitchenClean and service onlyReface/respray if dated; new siliconeNew cabinets, worktop, tiling
BathroomsRe-seal silicone; replace toilet seatFull re-seal, new fittingsRetile + new fittings + waterproofing
FlooringClean; re-grout minor cracksReplace lifted/cracked sectionsFull new vinyl or tile floor
FixturesReplace only broken itemsReplace worn items proactivelyUpgrade specification throughout
Typical cost — condoRM3,000 – RM5,500RM6,000 – RM12,000RM18,000 – RM40,000
Likely rent upliftRM0 – RM100/monthRM100 – RM250/monthRM250 – RM600/month

Painting cost for rental units

Repainting is the highest-impact, lowest-cost item in a rental refurbishment. The return on a full repaint is almost always positive.

  • A full 2-coat repaint (walls, ceilings, trim) for a condo costs RM1,800–RM3,500; a terrace house RM3,500–RM6,000.
  • A touch-up (patches, scuffs, one visibly stained wall) costs RM400–RM900 for a condo. This is sufficient if the unit is less than 2 years old and the previous tenant was clean.
  • Use washable emulsion (e.g. Nippon Vinilex 5000, Dulux Wash & Wear) for rental units — it allows light scuff marks to be wiped down during tenancy without repainting.
  • Always include at least a touch-up of the car porch gate — the first thing a prospective tenant sees.

For a detailed painting scope and pricing, see our home renovation cost guide →.

Deep cleaning cost

A professional post-vacancy deep clean before the new tenancy typically costs RM300–RM700 for a condo unit and RM600–RM1,200 for a terrace house. This covers:

  • Grout scrubbing and tile steam cleaning in bathrooms and kitchen.
  • Inside kitchen cabinets, drawers and appliances.
  • Air-conditioning vents and return-air filters.
  • All window frames, grilles and fly screens.
  • Balcony and utility area (washing machine area, drying rack).

For detailed pricing and scope, see our deep cleaning cost guide →.

Common repair costs between tenancies

These are the most frequently encountered repair items during a Klang Valley rental unit turnover:

  • Dripping taps: RM80–RM200 per tap (washer or cartridge replacement). Always fix — tenants notice instantly.
  • Running cistern: RM100–RM250 (usually a float valve or flapper replacement). Left unfixed, it wastes significant water and increases the water bill.
  • Blocked floor trap: RM80–RM200 (clear blockage, replace trap cover if cracked).
  • Dead electrical socket: RM80–RM350 (diagnose and repair; may need new socket or wiring behind).
  • Stiff or squeaking door: RM80–RM200 (hinge replacement or realignment).
  • Cabinet hinge replacement: RM100–RM300 for a set of kitchen/wardrobe hinges.

See our full turnover repair guide → for a complete scope list and how to decide what the landlord vs tenant pays for.

Fixture and appliance replacement costs

Some fixture replacements have an outsized impact on tenant perception relative to cost:

  • Toilet seat (RM80–RM200): If discoloured or cracked, always replace. The cost is negligible; the impact on first impressions is disproportionate.
  • Instant water heater (RM350–RM650 installed): Replace if over 8 years old or showing rust. Failure mid-tenancy creates urgent calls and poor tenant experience.
  • Basin tap / kitchen tap (RM120–RM350 installed): Replace if limescale-encrusted or dripping. A new tap looks clean and signals a well-maintained unit.
  • LED bulbs (RM8–RM25 per fitting): Replace all blown bulbs consistently (cool white 6500K is standard for rental); mixed bulb colours make a unit look neglected.
  • Shower hose and rose (RM80–RM200): Easy win — a new shower set is cheap and transforms the bathroom feel.
  • Kitchen hood filter (RM80–RM250): Grease-saturated aluminium mesh or carbon filter replacement. Cheap and eliminates the most common kitchen odour complaint.

ROI: does refurbishment pay?

The ROI of a rental unit refurbishment depends on the rental rate, void period avoided and rent uplift achieved. Here is a realistic worked example for a Klang Valley condo at RM1,800/month:

ScenarioStandard refurb (RM8,000)Basic turnover (RM4,000)
Monthly rent achievableRM1,950 (+RM150/mth vs old)RM1,800 (unchanged)
Void period avoided3 weeks faster = RM1,350 saved1 week faster = RM450 saved
First-year gainRM150 × 12 + RM1,350 = RM3,150RM0 × 12 + RM450 = RM450
Simple payback~2.5 years~9 years for cost of clean only
Deposit dispute riskLower (documented baseline)Higher (condition not reset)

For units where the rent gap is wider (e.g. a dated unit that can achieve RM300/month more with a mid-range upgrade), payback is faster. Use our renovation cost calculator → to run your own numbers.

Pre-refurbishment planning checklist

Before engaging a contractor, work through this list to define the scope clearly:

DecisionOptionsGuidance
Scope tierBasic turnover / Standard refurb / Full upgradeMatch to unit age, target rent, and competitor units in the building
Painting scopeTouch-up vs full repaintFull repaint if unit >3 years since last repaint or walls visibly stained
KitchenClean only / reface cabinets / full replacementFull replacement only if cabinets >10 years and structurally poor
BathroomsRe-seal / partial retile / full retileFull retile if waterproofing suspected to be failing; re-seal if cosmetic only
FlooringClean / patch / full replacementFull vinyl replacement is cost-effective at RM4,000–RM9,000 and transforms the unit
Target marketExpat / professional / family / budgetHigher-specification finishes for expat market; functional mid-range for professional/family
TimelineAvailable void periodStandard refurb needs 5–10 working days; full upgrade 3–6 weeks

How to choose a rental unit refurbishment contractor

  • Ask specifically about rental unit turnover experience — landlord-facing contractors understand the cost/return balance and work to tighter timelines than full home renovators.
  • Request an itemised quotation — painting, cleaning, plumbing repairs, electrical repairs, fixtures listed separately.
  • Confirm a single-mobilisation approach: all trades in one visit to minimise void days.
  • Ask for photos of recent rental unit work — not just high-end residential renovations.
  • Confirm the scope is covered by public liability insurance — required by most strata management offices.
⚠️ ClickBina prepares rental units across the Klang Valley — from basic turnovers to full refurbishments. WhatsApp us for an itemised quote.

Sources & official references

  • Contracts Act 1950 (Act 136) — applicable to tenancy agreements in Malaysia (no dedicated Residential Tenancy Act in force as at 2026).
  • CIDB Malaysia — Construction Industry Development Board; contractor registration and standards reference.
  • Jabatan Kerja Raya (JKR) — public works cost benchmarks used as reference by licensed quantity surveyors.
  • National House Buyers Association (HBA) — landlord and tenant rights guidance.

Common Questions

How much does it cost to refurbish a rental unit in Malaysia?
A basic between-tenancy turnover (touch-up repaint, deep clean, minor repairs) for a Klang Valley condo costs RM3,000–RM5,500. A standard full refurbishment (full repaint, all repairs, fixture replacements) runs RM6,000–RM12,000. A full mid-range upgrade including kitchen and bathroom works runs RM18,000–RM40,000.
How much does it cost to repaint a rental unit in Kuala Lumpur?
A full 2-coat repaint of a condo unit (700–1,000 sq ft) costs approximately RM1,800–RM3,500 in the Klang Valley. A terrace house runs RM3,500–RM6,000. Touch-up painting (patches only) for a condo costs RM400–RM900.
Is it worth refurbishing a rental unit before the next tenant?
Yes in most cases. A standard refurbishment (RM6,000–RM12,000) typically achieves RM100–RM250/month more in rent and reduces void by 2–3 weeks, recouping the investment within 2–3 years. The wider the gap between your current and achievable rent, the faster the payback.
How long does a rental unit refurbishment take?
A basic turnover (touch-up repaint, deep clean, minor repairs) takes 3–5 working days for a condo. A standard full refurbishment takes 7–14 working days. A full mid-range upgrade including kitchen and bathroom works takes 3–6 weeks.
What should be replaced in a rental unit between tenancies?
As a minimum: any broken or malfunctioning fixtures (taps, sockets, door handles), toilet seat if stained or cracked, water heater if over 8 years old, and all blown bulbs. Proactively replacing worn items (e.g. cabinet hinges, shower hose) prevents tenant complaints mid-tenancy.
Does a deep clean count as the landlord's or tenant's cost?
If the unit is being cleaned between tenancies as standard preparation for the incoming tenant, this is a landlord cost. If the outgoing tenant left the unit in a demonstrably dirtier condition than at handover (documented by the move-in inventory), the cleaning cost can be deducted from their security deposit. Good move-in documentation is essential.
How often should a landlord refurbish a rental unit?
As a rule of thumb: a basic turnover between every tenancy, a standard refurbishment every 3–5 years, and a full mid-range upgrade every 8–12 years. High-frequency short-term rentals may need annual deep refurbishments.
What is the ROI on a rental unit refurbishment?
A standard refurbishment (RM8,000) that achieves RM150/month more in rent and avoids 3 weeks’ void saves RM1,350 in the first year and earns RM1,800 more annually thereafter — a payback of roughly 2.5 years on a RM8,000 spend, with improved tenant quality and fewer mid-tenancy complaints.