Townhouse Renovation in Malaysia
Strata Landed Rules Explained (2026)

Upper or lower unit, or a landed home in a strata scheme? Here is what you can change, and who has to approve it.

Row of stacked townhouses with separate upper and lower unit entrances and a uniform facade

A Malaysian townhouse usually sits under a strata title, so it is renovated like a condo in some ways and like a landed house in others. Inside your own parcel, non-structural work mainly needs the management's written approval; the management may set conditions but, under By-law 27, cannot refuse unreasonably. Structural work, anything on the facade or roof, relocating wet areas over the unit below and any extension beyond your parcel need much more: management approval, often an engineer, and council approval. ClickBina's strata guide lists a typical renovation deposit of RM500 – RM3,000, refundable after inspection.

What a townhouse is, legally

In Malaysia, "townhouse" is used for two different things. ClickBina's guide to solar on condos and townhouses describes both: two stacked units sharing one building, each with its own entrance, or a row of landed homes inside a strata scheme. Either way, the title is usually strata, which is the key to every renovation question.

A strata title gives you a parcel and a share in the common property, and puts the development under a Joint Management Body or Management Corporation with by-laws. That is why a townhouse owner cannot simply follow the rules for a terrace house on an individual title. Our strata vs individual title guide explains the difference.

Your parcel, shared parts and common property

Before planning anything, find out exactly what is yours. Read the strata plan, the title and the by-laws, and ask the management office. For a townhouse, the questions that matter are:

Part of the buildingQuestion to answerWhy it matters
Interior finishes, fittings, non-structural wallsInside your parcel?Usually yours to change, with management approval
Columns, beams, structural walls, the slabPart of the building structure?Not yours to alter without an engineer and approval
The slab between upper and lower unitsWhose, and who repairs leaks through it?Wet-area work affects the unit below
The roof (upper unit)Allocated to your parcel, or common?Decides who may alter or repair it
Front yard, back yard, car porch (lower unit)Part of your parcel or an accessory parcel?Decides whether you can build on it
Facade, windows, grilles, awningsCovered by uniformity rules?External changes usually need approval

ClickBina's strata common property guide explains how common property is defined and managed. If the answers are unclear, get them in writing from the management before the contractor quotes, because the same job can be simple inside your parcel and a long approval process once it touches a shared part.

Management approval: By-law 27

The starting point is the management's written approval. ClickBina's guide to a rejected renovation sets out the rule: under By-law 27 of the Third Schedule to the Strata Management (Maintenance and Management) Regulations 2015 and the Strata Management Act 2013 (Act 757), proprietors have a right to renovate their parcels, and the management may impose conditions but cannot refuse unreasonably.

  • Submit the application form with a simple floor plan or sketch of the changes.
  • Include the contractor's details and the renovation deposit.
  • Wait for written approval and the permitted working dates before starting.
  • Keep the approval and any conditions with your renovation contract.

If the management refuses, the rejected-renovation guide explains how to ask for reasons and the route to the Strata Management Tribunal.

Structural work and council approval

ClickBina's strata renovation rules guide is clear that columns, beams, shear walls and floor plates are part of the building structure, not your unit. Hacking a wall that turns out to be structural, cutting openings in slabs or adding load all need a structural engineer's assessment and management approval first.

On top of that, structural works and extensions generally need building plan approval from the local council. The strata vs individual title guide adds the strata limit: a strata owner cannot extend outside the parcel boundaries. Our guide to illegal extensions explains what happens when that step is skipped.

Upper and lower units: living on top of each other

In a stacked townhouse, your floor is someone else's ceiling, or the other way round. That changes several renovation decisions:

  • Wet areas: the strata rules guide lists relocating wet areas (bathroom, kitchen) without a structural engineer's assessment and management approval among the things you cannot do, because of the risk to the unit below.
  • Waterproofing: management often asks for a record of the waterproofing for wet-area works, precisely to protect the unit below.
  • Noise: hacking and drilling travel straight into the other unit; agree the noisy days in advance.
  • Roof: for an upper unit, roof repairs, solar panels or water tanks depend on whether the roof is allocated to your parcel.
  • Yard and porch: for a lower unit, covering or enclosing the yard is an external change and may be an extension.

Facade, grilles and awnings

Townhouse developments are usually designed as a uniform row. The strata rules guide lists changing the building's external appearance, including awnings, painting the facade and changing window grille designs, among the things that need management approval. Many schemes publish an approved design for grilles, awnings and gates; using it makes approval straightforward. Ask for it before choosing anything.

Deposits, working hours and neighbours

Expect the same practical conditions as in a condo: a refundable renovation deposit, set working hours, limits on noisy work, rules on debris removal and contractor registration with the management office. ClickBina's strata rules guide lists a typical deposit of RM500 – RM3,000, refundable after a final inspection. Our renovation hours and noise guide covers the working-hours side and how disputes are handled.

ConditionTypical requirementSource
Renovation depositRM500 – RM3,000, refundable after final inspectionStrata renovation rules guide
Written approvalBefore any work startsBy-law 27, via the rejected-renovation guide
Structural or wet-area relocationEngineer's assessment plus management approvalStrata renovation rules guide
Extension beyond the parcelNot permitted for a strata ownerStrata vs individual title guide

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Planning a townhouse renovation step by step

  1. Find out what your parcel includes: strata plan, title, by-laws, and any allocated roof, yard or porch.
  2. Ask the management for its renovation rules, forms, approved designs and deposit.
  3. Separate the work into internal non-structural items and anything structural, external or wet-area related.
  4. Get an engineer's view on anything structural, and check whether council approval is needed.
  5. Submit the application and wait for written approval before booking the contractor's start date.
  6. Tell the neighbours above, below or beside you when the noisy work will happen.

How ClickBina can help

WhatsApp us your job details for a quote: whether it is an upper or lower unit, what you want done, and what the management has said so far. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the internal works can be planned around the management's conditions and working hours. We reply within the hour, and the price we agree is a flat price with no hidden charges. A site visit is free.

Sources & methodology

  • ClickBina solar on condos and townhouses guide — the two meanings of a strata townhouse and roof allocation.
  • ClickBina rejected renovation guide — By-law 27 and the Strata Management Act 2013.
  • ClickBina strata renovation rules guide — what you cannot do, deposits and conditions.
  • ClickBina strata vs individual title guide — extensions and council approval.

How we estimated prices: the deposit range is quoted unchanged from ClickBina's strata renovation rules guide; each development sets its own figure. This page is general information, not legal advice.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Do I need approval to renovate my townhouse?
If it is under a strata title, yes: written approval from the JMB or MC before starting. Structural work and extensions may also need council approval.
Can the management refuse my renovation?
They can set conditions, but under By-law 27 they cannot refuse unreasonably. The Strata Management Tribunal is the route if they do.
Can I extend my townhouse into the yard?
A strata owner cannot extend outside the parcel boundaries, and extensions generally need council approval. Check whether the yard is part of your parcel first.
Can I move the bathroom in an upper townhouse unit?
Not without a structural engineer's assessment and management approval, because of the risk to the unit below.
Who is responsible for the townhouse roof?
It depends on whether the roof is allocated to your parcel or is common property. The strata plan and by-laws say which.
Can I change the grilles or add an awning?
External changes usually need management approval. Ask whether the scheme has an approved design.
How much is the renovation deposit?
ClickBina's strata guide lists a typical RM500–RM3,000, refundable after a final inspection; each development sets its own.