Generation down, bill up? Work out whether it is dirt, shade, the inverter, a cable or just the bill.
📍 We serve KL, Selangor & Putrajaya.

When a home solar system produces less than it should, start with the inverter app: a slow decline that recovers after rain points to dirt, while a sudden drop or one section producing far less points to a fault or new shade. Other common causes are an inverter error or trip, a damaged cable or connector, and a bill that rose because the household uses more, not because the panels make less. As a guide, ClickBina's solar cost guide lists a 3 kWp system at about 330 – 390 kWh a month. Faults on the panels, wiring and inverter go to your installer; leaks around roof mounts are a roofing job.
Before hunting for a fault, know roughly what the system should make. ClickBina's solar panel cost guide gives typical monthly generation for common home system sizes. Real output swings with the weather and the season, so compare like with like: this month against the same month last year, or a clear week against a clear week.
| System size | Typical monthly generation | Source |
|---|---|---|
| 3 kWp | About 330 – 390 kWh | Solar panel cost guide |
| 6 kWp | About 660 – 780 kWh | Solar panel cost guide |
A roof that faces north, a steep shaded valley or an array split across several roof faces will sit at the lower end or below it. The same guide notes that north-facing surfaces generate less in Malaysia. What matters for diagnosis is a change from your own normal, not a gap against a brochure figure.
Most systems come with app-based monitoring, and it is the best diagnostic tool you have. ClickBina's solar cleaning and maintenance guide explains how to read it: a slow decline that recovers after heavy rain points to dirt, while a sudden drop, or one section producing far less than the rest, points to a fault or shading and is a job for the installer, not a cleaner.
| What you see | Most likely cause | Who deals with it |
|---|---|---|
| Slow decline over months, recovers after rain | Dust, haze film or droppings on the glass | Cleaning |
| Dip at the same time every day | New shade from a tree, a water tank or a new building | Owner, then installer |
| One string or panel much lower than the rest | Shade, a failed panel or a connector fault on that string | Installer |
| Zero output on a sunny day, error on the inverter | Inverter fault or trip, or an isolator switched off | Installer |
| Output stops whenever the grid is off | Normal grid-tie behaviour, not a fault | Nobody |
| Monitoring shows nothing at all | Wi-Fi or data logger offline, not necessarily the system | Owner, then installer |
| Bill up, generation normal | Household consumption has risen | Owner |
A thin even layer of dust lowers output a little across the whole panel. A single bird dropping or a leaf can shade part of a cell and pull down the output of the whole string of cells it belongs to, as the cleaning guide explains. Rain helps, but it does not clean off droppings or the greasy film left after haze.
The solar cost guide suggests rinsing panels clean once or twice a year. Low-tilt panels, roofs near highways or construction and roofs under trees need it more often. The cleaning guide sets out the safe method and warns against pressure washers and standing on panels.
Shade is the cause people miss because it creeps in. A tree grows, a neighbour adds a storey, a new water tank or aerial goes up. Most home systems use a string inverter, and ClickBina's inverter guide explains the weakness: a string acts like a single larger panel limited by its poorest performer, so shade on one panel pulls the whole string down.
Watch the daily curve for a dip at the same hour. If the shade is from your own tree, trimming it is the cheapest fix you will find. If it is permanent, the inverter guide explains that microinverters or optimisers limit the loss to the shaded panels; that is a design change to discuss with the installer.
The inverter converts the panels' DC output into AC for the house and the grid, and the solar cost guide calls it the most likely component to fail. Plan to replace it once over a panel life of around 25 years. Signs of an inverter problem are an error code, a unit that restarts repeatedly, or output that stops while the sun is out.
Location matters. The inverter guide notes that a wall-mounted inverter should sit somewhere shaded and ventilated, because heat shortens the life of electronics; a unit in full afternoon sun is a poor choice. Do not open the inverter or the DC isolators yourself. The panels produce electricity whenever light reaches them, so the DC side is live in daylight.
If the system stops every time the grid goes off, nothing is wrong. The inverter guide explains that grid-tie inverters are designed to shut down automatically when the utility supply is lost, for safety, and do not provide backup power during outages. Only a hybrid system designed for backup keeps supplying the house. Frequent short trips on a stable grid are a different matter and worth raising with the installer.
The cleaning guide lists what a proper maintenance visit checks: inverter status and error history, cables, connectors and cable ties that sun and animals damage over time, mounting rails and clamps, gutters below the panels, signs of nesting, and new shading. Pigeons nesting under the array bring droppings and chewed cables. A single failed connector can take a whole string offline.
Ask the maintenance visit to state in writing what it checked and what it found. That record is what separates a real fault from guesswork.
Many "underperforming" calls turn out to be billing questions. Under net energy metering, as the solar cost guide describes, the panels power the home first and only the surplus is exported and credited. If the family added an aircon, started working from home or charges a car, the bill rises even with normal generation. Compare the app's generation with last year before assuming a fault.
Export schemes change. ClickBina's solar leasing guide notes that SEDA's Solar ATAP is the continuation of the NEM programme, which concluded at the end of June 2025; confirm the terms of your own scheme with your installer or the energy authority if the way credits appear on the bill has changed.
Panels, inverter and wiring are the solar installer's work. ClickBina's solar installer guide explains how to check that a company appears in SEDA's RPVSP directory of PV service providers and where to complain if something goes wrong. It also notes that the homeowner remains responsible for the safe operation and maintenance of the installation up to the interconnection point, which is one more reason to keep the maintenance records.
The roof is a separate trade. A leak that started after the panels went in is almost always at a mounting penetration; ClickBina's solar roof leak guide explains how to tell and who to call.
ClickBina does not publish solar repair prices. These are the related figures on ClickBina's solar guides (indicative 2026, Klang Valley), useful for judging a replacement against a repair.
| Item | Indicative price | Source guide |
|---|---|---|
| 3 kWp system, installed | RM14,000 – RM20,000 | Solar panel cost guide |
| 6 kWp system, installed | RM24,000 – RM32,000 | Solar panel cost guide |
| Droppings clean-up & disinfection | RM200 – RM600 | Solar cleaning guide |
| Tiled / metal roof repairs at penetrations | RM500 – RM3,000 per job | Solar cleaning guide |
| Leak detection & assessment | RM300 – RM800 per visit | Solar cleaning guide (charged separately) |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteA drop in output alone is not a roof problem. Keep the two questions apart: the installer for generation, a roofer for water.
Solar installation and repair are not among ClickBina's own trades. Where the problem is on the roof, such as a leak around the mounts, birds under the array or a roof that needs work while the panels are there, WhatsApp us your job details for a quote: the roof type, the system size and what has changed. Roof leaks are assessed through ClickBina's leak detection at RM300 – RM800 per visit, charged separately from repairs. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We reply within the hour, and the price we agree is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.