Make it safe, record the damage, then follow the right guide for each step: cleaning, repairs and keeping the next flood out.
📍 We serve KL, Selangor & Putrajaya.

If your house has flooded, make it safe first, record the damage second, and only then start cleaning: keep the main switch off, take photos and video of every room before anything is moved, and call TNB CareLine 15454 if the supply needs to be cut. After that the work falls into three parts: cleaning up (mud, disinfection, drying, mould and throwing out what cannot be saved), repairing and renovating (walls, paint, floors and the bigger rebuild) and preventing the next flood. This page tells you which ClickBina guide covers each step, so you can go straight to the one you need.
The first hour back in a flooded house matters more than any product or contractor. Most of the damage is already done, but three things can still go wrong: someone gets an electric shock, the evidence your insurer needs is shovelled out with the mud, or wet walls are sealed up before they have dried. The short list below is the order to follow before any cleaning starts.
Floods leave people with a dozen questions at once. Find the line that matches where you are today and start with that guide; each one links on to the next step.
| Where you are | Start with |
|---|---|
| Just allowed back in, not sure what is safe | The first-steps box above, then the walk-in checklist it links to |
| The house is full of mud and you want a crew to clean it | Flood clean-up service: what a crew does |
| Furniture, mattresses and appliances need to go | Flood debris and furniture disposal |
| You are about to make an insurance claim | Documenting flood damage for an insurance claim |
| The house is clean and you are planning the repairs | Flood-damaged house restoration: order of works |
| The monsoon is coming and you want to be ready | Pre-monsoon flood preparation for landed homes |
| Water comes in at the door or the gate | Flood barriers and flood doors |
| The toilet or floor trap backs up when it rains | Sewage backing up in heavy rain |
Clean-up is the stage people most want to rush, and the one where rushing costs the most later. It has five parts, roughly in this order. First the mud and silt come out while they are still soft: our guide to removing mud and silt covers the tools and why you never hose mud into the floor traps. Then come the hard decisions about what to keep, covered in keep or throw after a flood: soaked mattresses, upholstery and particleboard usually cannot be saved, while solid timber, metal and glass often can.
Hard surfaces are then washed and disinfected, because floodwater carries sewage; disinfecting a house after a flood explains which products to use and which ones must never be mixed. After that the house has to dry properly, which takes far longer than it looks: drying out a flooded house explains airflow, dehumidifiers and how to tell when a wall is really dry. Finally, if spots have already appeared behind the skirting or inside cabinets, mould after a flood covers where it starts and how it is removed.
Repairs start only when the structure is dry. Putting paint, skirting or new flooring onto a wet wall traps the water inside and the finish fails within months. The order of works guide linked above sets out the full sequence; the guides below go deep on each surface.
Once the house is back in use, the question becomes how to keep the water out, or at least how to make the next flood less damaging. The checklist and the flood-barrier guide in the table above are the starting points. Three more guides cover the specific problems behind repeat flooding:
Electricity is the one part of a flood clean-up where a mistake can kill. TNB's flood advice is clear on the basics: keep the main switch off while you clean, do not touch equipment or cables that have been under water, and do not switch submerged appliances back on to see whether they still work.
Before the house is re-energised, submerged switches, sockets, wiring and appliances must be inspected and tested by an electrical contractor registered with Suruhanjaya Tenaga. That contractor decides what can be reused and what must be replaced. If water reached the distribution board, tell them so when you book.
Floodwater mixes rain with drain and sewage water, so treat everything it touched as contaminated until it has been washed and disinfected. Wear boots, gloves and long sleeves, keep children and pets out while the mud is being removed, and wash your hands before eating. Anyone with a wound should keep it covered and out of the water.
Malaysian health guidance on flood clean-up was not reachable when this page was written, so the practical references here are from the US Environmental Protection Agency. Its flooded-homes guidance lists mould and bacteria, mosquitoes and generator hazards among the dangers in a flooded home. It also warns that removing deep standing water too quickly can crack walls and floors, and that everything must be completely dry before walls and floors are refinished. If you feel unwell after a flood clean-up, see a doctor and say that you have been in floodwater.
Do not assume your policy covers flood. Reporting on Bank Negara Malaysia's Financial Stability Review after the December 2021 floods said significant gaps remain in flood insurance and takaful protection, particularly among households. Sources disagree on what a standard houseowner or householder policy includes, so the only reliable answer is your own policy schedule: look for flood or special perils, and call your insurer or agent before the clean-up crew arrives.
For a flood claim, the evidence has to exist before the strip-out: photos, a list of damaged items and, for larger jobs, a contractor's written report. The documentation guide in the table above covers that in detail. For leaks and burst pipes rather than floods, see the water damage insurance claim guide, and for what home cover is in general, the home insurance guide.
After a flood it is easy to call the wrong people first. This table lists who handles what.
| You need | Contact | Notes |
|---|---|---|
| The electricity supply cut or a fallen line reported | TNB CareLine 15454 | TNB's own flood advice lists this line |
| Wiring, sockets and appliances checked before reuse | An electrical contractor registered with Suruhanjaya Tenaga | Ask to see their registration |
| To start a claim | Your insurer or agent | Check the policy schedule for flood cover first |
| Bulky waste and flood rubbish collected | Your local council | Collection arrangements differ by council; ask before piling waste on the road |
| River levels and flood warnings | JPS Public InfoBanjir | Official river level and rainfall stations |
| Clean-up, disposal, repairs and prevention work | ClickBina on WhatsApp | Send your area and property type |
In the Klang Valley a flood can come with the northeast monsoon or with a sudden afternoon storm. Two official sources are worth bookmarking before the next storm: JPS Public InfoBanjir shows live river levels and rainfall from monitoring stations, and MetMalaysia issues heavy-rain warnings and the seasonal outlook. If you live in an area that has flooded before, a warning is the time to move valuables and appliances up, switch off at the main switch before leaving, and close any flood boards.
ClickBina is an experienced KL & Selangor contractor, and our crew handles the physical work across all three pillars: mud-out and cleaning, disinfection, debris and furniture disposal, drying, wall and floor repairs, repainting, renovation and prevention installs such as flood boards. We do the non-electrical work.
Testing and re-energising the electrics must be done by an electrical contractor registered with Suruhanjaya Tenaga. Whole-house refurbishment and trade coordination is part of what we do, so one team can take a flooded ground floor from mud-out to handover.
WhatsApp us your area, the property type and what the flood damaged, and we reply within the hour.
How we wrote this: this hub gives no prices and no fixed timings; each linked guide covers its own step in depth. Electrical advice follows TNB's published flood guidance.
WhatsApp us your job details for a quote — we reply within the hour. Any visit fee is confirmed with you on WhatsApp before we come. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.