Drains, backflow, pumps, flood boards, insurance and a grab bag: what to do in November, before the water comes.
📍 We serve KL, Selangor & Putrajaya.

Prepare a landed house for flood season before the heavy rain arrives: clear the drains and silt traps, stop water coming back up the floor traps, test the sump pump and flood boards, move valuables and appliances up, check your insurance schedule and pack an emergency bag. The northeast monsoon is projected to run through to March, so November is the month to do it. This checklist sets out each job in order, what you can do yourself and what is worth getting a contractor for. If your house has already flooded, start at the flood clean-up, repair and prevention hub instead.
Selangor's Department of Irrigation and Drainage (JPS) has identified 56 flood hotspots and 232 high-risk zones across the state for this season, according to The Star. Klang tops the list, followed by Petaling, Gombak and Hulu Langat, and the North-East Monsoon is projected to stretch through to March. Kuala Lumpur has its own flash-flood spots too.
For a terrace, semi-D or bungalow, the useful window is short. Once the first big storm has flooded a street, every drain contractor and every hardware shop is busy at the same time, and the jobs that take an afternoon in early November become a queue in December. Most of the list below is cheap, quick work that only pays off if it is done before the water comes. The roof is a separate job with its own checklist: see the monsoon roof preparation checklist.
Every flood plan starts with one question: where does the water come from, and how high has it come before? A landed house in the Klang Valley usually floods in one of three ways, and each needs a different answer.
Ask the neighbours how high the water came last time, look for old tide marks on the walls and gate posts, and check the nearest river-level station on JPS Public InfoBanjir. If the house sits below the road, the guide to raising the ground floor explains the long-term options.
Most of the water that floods a landed house in a cloudburst should have left through its own drains. Before the season, walk the whole perimeter. Lift the drain covers, scoop out sand, leaves and old renovation debris, and check that water flows towards the outlet, not back towards the house.
Do not sweep mud or debris into the council monsoon drain outside. Blocked public drains are the council's job; report them early in the season rather than during the first storm.
If dirty water has come up through the floor traps or the toilet before, the house has a backflow problem, and a flood board at the door will not stop it. The usual fixes are non-return valves on the ground-floor drainage, sealed or plugged floor traps in rooms that are not in use, and making sure the last inspection chamber before the council drain is not cracked or open. The guide to sewage backing up in heavy rain explains how to tell which kind of backflow you have.
A cheap stop-gap for the season is a set of drain plugs or weighted bags for the floor traps you do not need, kept by the door with the flood boards. Take them out again after the water goes down, or the bathroom will not drain.
Anything you only use when it floods is the thing most likely to fail when it floods. In early November, take each item out and try it.
When a flood warning comes, there is rarely enough time to carry a fridge upstairs. Decide now what goes where, and move what you can before the season starts:
For a single-storey house, the plan is about height and speed: high shelves, raised stands and a list of what to grab. If water reaches the same rooms every year, the bigger fix is a raised plinth or threshold, covered in the long-term section below.
TNB's flood safety advice is simple, and it is worth reading before the season, not during a flood. When water enters the house, avoid using electrical appliances and switch off the main switch at the distribution board. Before you leave the house, switch off the main incoming supply at the main switch, switch off and unplug appliances at the sockets, and keep electrical equipment in a high place away from the water. If the house has solar PV, switch it off before leaving so it cannot feed power back into the house wiring.
Make sure every adult in the house knows where the distribution board is and which switch is the main switch. Never touch electric poles or stay wires during a flood, and call TNB CareLine 15454 if the water is rising and the supply needs to be cut. Moving sockets or the distribution board higher up the wall is a sensible long-term change in a house that floods often. That work must be done by an electrical contractor registered with Suruhanjaya Tenaga.
Check your insurance before the season, while there is still time to change it. Look at your policy schedule for flood, special perils or natural disaster cover, for both the building and the contents, and ask your insurer or agent to confirm in writing if you are not sure. Sources disagree on what a standard home policy includes, so do not assume either way. The home insurance guide explains the policy types.
Then take a slow video of every ground-floor room, inside every cabinet and wardrobe, and of the model plates on your appliances. Save it to cloud storage. If the house floods, that video is your proof of what was there before. The flood insurance claim guide explains what else to record after a flood.
Selangor's authorities have urged residents to prepare family emergency bags this season. Keep one bag per household by the stairs or the door, packed and ready, so nobody has to think when a warning comes.
| Put in the bag | Why |
|---|---|
| ICs, passports and copies of your insurance schedule in a sealed plastic bag | You will need them for relief centres, aid and claims |
| Medicines for everyone in the family, plus prescriptions | Pharmacies may be closed or cut off |
| A torch, spare batteries and a charged power bank | The supply may be cut for safety |
| Bottled water and food that needs no cooking | Tap water may not be safe for a while |
| A change of clothes, rubber boots and gloves | For leaving through water and for the first look back inside |
| Some cash and a list of phone numbers on paper | Phones go flat and card terminals may be down |
| Items for babies, elderly family members and pets | These are the things people forget in a hurry |
A plan only works if everyone knows it. Agree it at home in November, write it on one page and stick it inside a kitchen cabinet door. Follow official evacuation orders when they are given; do not wait to see how high the water gets.
| When | What to do |
|---|---|
| Early November | Clear drains, test the pump and flood boards, check insurance, pack the grab bag, take the baseline video |
| Heavy-rain warning issued | Check JPS Public InfoBanjir and MetMalaysia, move small items and documents up, park the car on higher ground |
| Water reaching the road | Fit the flood boards, plug unused floor traps, put furniture on blocks |
| Water about to enter, or told to leave | Switch off the main switch and solar PV, take the grab bag, follow evacuation orders |
| After the water goes down | Keep the main switch off, photograph everything, then follow the returning-home checklist |
Sign up for weather warnings on MetMalaysia or its myCuaca app, and keep the nearest JPS river-level station bookmarked. When you are allowed back in, the returning home after a flood checklist covers the first hour.
If the same rooms flood every season, the checklist above only limits the damage. The lasting fixes change how water reaches the house: raised thresholds and plinths at the doors, resized or regraded perimeter drains, a sump pit and pump at the lowest point, permanent flood gates at the porch, and floor finishes and cabinets that cope with water, such as tiles and plastic or aluminium carcasses rather than particleboard. Some of these need council approval, especially work at the gate or on the boundary. Where rain also gets in through doors and walls, see where rainwater comes into the house.
ClickBina is an experienced KL & Selangor contractor. Before the season, our crew clears perimeter drains and silt traps, fixes drain falls, fits flood boards and flood doors, builds raised plinths and thresholds, and installs sump pits and pumps. We do the non-electrical work, and we can look at the low points around your house with you and tell you which jobs are worth doing first.
WhatsApp us your area, the property type and how the house has flooded before, and we reply within the hour.
How we wrote this: this checklist gives no prices and no fixed timings; every house floods differently. Electrical advice follows TNB's published flood guidance.