Renovation Packages Malaysia: What They Include & Exclude
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📦 Renovation Packages

Renovation Packages in Malaysia
What They Include, Exclude & How to Compare

Kitchen, toilet, condo and landed packages turned back into a scope you can check, with published market ranges.

📍 We serve KL, Selangor & Putrajaya.

Half-installed condo kitchen with new cabinets, stacked tiles and a blank checklist on the worktop

A renovation package is a fixed bundle of works sold at one headline price: typically demolition, tiling, plumbing and electrical points, carpentry, painting and debris removal for a kitchen, a bathroom or a whole condo or terrace. The headline number only means something once you know the quantities, the material grades and the list of exclusions behind it, so the useful way to judge any package is to turn it back into an itemised scope. This guide explains what packages usually cover and leave out, gives scope tables for condos, landed homes and kitchen-plus-toilet jobs, shows the market ranges ClickBina's cost guides already publish, and sets out how to compare two offers. For whole-home figures, see the renovation cost guide; for the service itself, see our house renovation page.

What a renovation package actually is

Contractors and design-and-build firms sell packages because most Klang Valley homes repeat a handful of layouts. A township of identical terraces, or a condo block with four unit types, lets a firm reuse the same drawings, order materials in bulk and price a standard scope once. When that standard scope matches your home, a package can be quick to agree and easy to budget for.

The catch is that a package is priced for an assumed home, not yours. The firm has decided how many power points, how many running feet of cabinet, which tile grade and how much hacking the price allows. Anything your house needs beyond those assumptions becomes an add-on. That is not dishonest in itself; the question is whether the assumptions are written down before you pay a deposit.

It also helps to separate the different products that share the word. Interior design firms sell design-led bundles, which the interior design packages guide examines tier by tier. Developers sell optional fittings before handover, covered in the developer upgrade package comparison. This page is about the third kind: renovation packages from contractors, priced per room or per unit.

The main types of package on the market

Package typeWhat it usually coversWhat to watch
Kitchen packageHacking of old cabinets and tiles, new top and bottom cabinets, worktop, wall and floor tiling, sink and tap, basic lightingCabinet length cap, carcass material, whether a wet-and-dry partition is included
Toilet / bathroom packageHacking, waterproofing, re-tiling, sanitaryware, shower set, plumbing reconnectionWaterproofing method and extent, brand of fittings, whether the water heater is supplied
Kitchen + toilets comboOne kitchen and one to three bathrooms bundled into a single priceBundle discounts that hide a lower specification in one of the rooms
New-unit condo packageCarpentry, lighting points, ceiling and painting for a unit straight after handoverBuilding management rules, deposit and working hours left off the scope
Full-house or landed packageSeveral rooms plus flooring, painting, electrical and sometimes roofing or a rear extensionOlder wiring, roof condition and structural items priced only after hacking starts

Most firms advertise one of the first three, because rooms are easy to standardise. Whole-house packages are harder to price honestly without a site visit, which is why their headline numbers vary the most.

What a package normally includes

A reasonable renovation package names each trade it covers and gives a quantity or allowance for each one. Expect to see some version of these lines:

  • Demolition and hacking of the items being replaced, with the area or item count stated.
  • Wet works: screeding, waterproofing in wet areas and tiling, with a tile supply allowance.
  • Plumbing and electrical points, counted, plus whether existing points stay where they are.
  • Carpentry, stated in running feet, with the board type (melamine-faced chipboard, MR plywood) and door finish.
  • Painting and ceiling work, with the paint brand or grade and which rooms are included.
  • Debris disposal and site cleaning at the end of the job.

If a line is missing from the written offer, assume it is not in the price until the firm confirms it in writing.

What packages usually leave out

Two packages with similar headline prices often differ mainly in their exclusions. These are the items that most often sit outside the bundle:

Often excludedWhy it mattersWhat to ask
Moving the sink, toilet or hobRelocating points means new hacking, piping and wiringIs any point relocation included, and how is each extra point priced?
Tile upgradesThe allowance may cover a basic tile, not the one in the showroomWhat is the supply allowance, and who pays the difference?
Light fittings and appliancesWiring may be included while the fittings are notWhich fittings, hood, hob and heater are supplied?
Management deposit and protectionCondos usually require a deposit, lift and corridor protectionWho pays the deposit and sets up protection?
Rewiring and hidden defectsOld wiring, leaking pipes and hollow screed appear once hacking startsHow are surprises priced, and do you approve them before work continues?
Loose furniture and curtainsRarely part of a renovation scopeBudget these separately from day one

Condo package: a typical scope

Condo packages are the most standardised, because units in one block share plans and the building limits what can change. A typical whole-unit condo package looks like this; check each line against your own unit before comparing prices.

AreaUsually in the packageOften extra
KitchenNew cabinets, worktop, backsplash tiles, sinkWet-and-dry glass partition, appliances, moving the hob
BathroomsRe-tiling, waterproofing, new fittingsGlass screen, vanity cabinet, water heater
BedroomsWardrobes in the main bedroom, paintingWardrobes in other rooms, study desks
Living and diningPainting, TV console, a few extra lighting pointsFeature wall, plaster ceiling with cove light
Building rulesDebris removalManagement deposit, lift protection, permitted-hours scheduling

For a unit straight after handover, the order of works and the management paperwork are covered in the new condo first renovation guide. Building rules differ between condos, so read your own house rules before signing any package.

Landed and terrace package scope

Landed homes fit packages less neatly. Terrace houses in one row can look identical but differ in wiring age, roof condition, earlier extensions and how the rear kitchen was built. A landed package should therefore be treated as a starting estimate that is re-confirmed after a site visit, not a binding price.

ItemWhat a fair landed package statesCommon gap
Wet kitchen and dry kitchenWhich kitchen is rebuilt, cabinet length for eachRear extension roof and drains not checked
Bathrooms upstairs and downstairsEach bathroom listed separatelyUpstairs waterproofing treated as optional
FlooringArea per floor and the materialStaircase finish left out
ElectricalPoints counted, DB box upgrade statedRewiring of an older house priced later
External worksPorch, gate, grilles listed if includedCouncil approval for anything structural not mentioned

Anything that adds floor area or changes the structure, such as an extension or a removed load-bearing wall, usually needs council approval and plans prepared by a registered professional. That is general advice: check the requirement with your local council before relying on any package that includes such work.

Published market ranges to compare a package against

ClickBina publishes no package prices, because each job is quoted on its own scope. The table below repeats ranges that ClickBina's cost guides already publish (indicative 2026, Klang Valley), so you can see whether a package headline is in a sensible band for its scope.

ScopePublished rangeSource guide
Kitchen, basic refreshRM8,000 – RM15,000Kitchen renovation cost guide
Kitchen, mid-range (new cabinets, worktop, tiling, wet and dry split)RM20,000 – RM35,000Kitchen renovation cost guide
Kitchen, premiumRM45,000 – RM80,000+Kitchen renovation cost guide
Bathroom, basic (each)RM6,000 – RM10,000Bathroom renovation cost guide
Bathroom, mid-range (each)RM12,000 – RM18,000Bathroom renovation cost guide
Bathroom, premium (each)RM20,000 – RM35,000+Bathroom renovation cost guide
Interior design package, entry (condo)RM30,000 – RM80,000Interior design packages guide
Interior design package, mid (condo)RM80,000 – RM150,000Interior design packages guide
Interior design package, premium (condo)RM150,000+Interior design packages guide
Landed design-and-buildRM80,000 – RM250,000+Interior design packages guide
Whole home, light refreshRM50 – RM90 per sq ftRenovation cost guide
Whole home, mid-range full renovationRM90 – RM150 per sq ftRenovation cost guide
Whole home, premium or structuralRM150 – RM200+ per sq ftRenovation cost guide

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

A package far below the matching band is not necessarily a bargain: the difference usually sits in the exclusions or in a lower material grade. More detail per room is in the kitchen renovation cost guide and the bathroom renovation cost guide.

How to compare two renovation packages

Comparing headline prices tells you very little. Put the two offers side by side and work through them in this order:

  1. Turn each offer into a list of quantities. Cabinet running feet, tiled area, number of points, number of rooms painted. Where an offer says “1 lot”, ask for the quantity behind it.
  2. Match the materials. MR plywood against chipboard, the tile allowance, the paint grade and the fitting brands. A cheaper package often differs here rather than in labour.
  3. List the exclusions side by side. Add a fair amount for each excluded item you actually need, then compare the totals.
  4. Check who does what. Ask which trades are the firm's own and which are subcontracted, and who supervises the site. The main contractor comparison explains why one accountable party matters.
  5. Read the payment terms. Stage payments tied to completed work protect you; a large share up front does not.

The guide to reading a renovation quote goes line by line through what an itemised quotation should show.

Deposits, payment stages and variations

Package sales often lean on a promotion deadline. Keep the money rules the same whatever the deadline says. ClickBina's interior design packages guide notes that a booking or design deposit is commonly 10–20%, that each later payment should follow a completed stage of work, and that the final 5–10% should stay with you until defects found at handover are fixed.

Variations are where a package can drift. Any extra work, such as moving a point or upgrading a tile, should be priced and approved in writing before it is done. The renovation cost guide also suggests keeping a 10–15% contingency, because older homes often reveal wiring or plumbing problems once walls are opened. What belongs in the agreement itself is set out in the renovation contract guide, and the warning signs of a deposit grab are in the renovation deposit scam guide.

How ClickBina quotes package-type jobs

We design and build, and we renovate kitchens, bathrooms, full condos and landed houses, including extensions and upper floors. We do not sell fixed packages at a published price. Instead, send us your job details on WhatsApp: the property type, the rooms and the works you want included, and anything you already know you want to keep.

We reply within the hour, and the price we agree is a flat price with no hidden charges. If you only need a kitchen, our kitchen renovation service covers that scope on its own. Whoever you choose, ask for the same thing: a written scope with quantities, materials and exclusions, so the offer can be compared with any package on the market.

Sources & methodology

  • ClickBina interior design packages guide: package tiers for a condo, the landed design-and-build range, deposit and retention percentages.
  • ClickBina kitchen renovation cost and bathroom renovation cost guides: room tiers (indicative 2026, Klang Valley).
  • ClickBina renovation cost guide: whole-home ranges per sq ft and the contingency allowance.

How we wrote this: every RM figure on this page is repeated unchanged from the ClickBina guides named above and is an indicative Klang Valley range, not a ClickBina package price. ClickBina does not publish package prices; each job is quoted on its own scope. No timings are given, because they depend on the scope and the building.

Ready to plan your project?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What is usually included in a renovation package in Malaysia?
Most packages bundle hacking of the items being replaced, wet works and tiling, a set number of plumbing and electrical points, carpentry by the running foot, painting and debris disposal. The quantities and material grades behind each line decide what the price really buys.
What do renovation packages usually exclude?
Common exclusions are moving the sink, toilet or hob, tile upgrades above the allowance, light fittings and appliances, the condo management deposit and protection, rewiring of older homes, and loose furniture.
Is a renovation package cheaper than a custom quote?
Sometimes, when your home matches the layout the package was priced for. Once you add the excluded items you need, the totals are often close. Compare both on the same list of quantities and materials.
How much does a kitchen renovation package cost?
ClickBina's kitchen cost guide publishes RM8,000 – RM15,000 for a basic refresh, RM20,000 – RM35,000 for a mid-range kitchen and RM45,000 – RM80,000+ for premium work (indicative 2026, Klang Valley). These are market ranges, not package prices.
Does ClickBina offer fixed renovation packages?
No. ClickBina quotes each job on its own scope. Send your job details on WhatsApp for a quote; we reply within the hour, and the agreed price is a flat price with no hidden charges.
How much deposit should I pay for a renovation package?
ClickBina's interior design packages guide notes that a booking or design deposit is commonly 10–20%, with later payments tied to completed stages and the final 5–10% held until handover defects are fixed.
Are condo renovation packages different from landed ones?
Yes. Condo packages are easier to standardise because units share plans and building rules limit changes. Landed packages should be re-confirmed after a site visit, because wiring, roofs and earlier extensions vary from house to house.

Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote