Doors, beams, mirrors, the kitchen and the altar: what each common request means for the builder and the budget.
📍 We serve KL, Selangor & Putrajaya.

Whether to follow feng shui is a household decision, and a contractor's job is simply to know what each request means in building terms. Most requests are cheap if raised before the drawings: turning a bed away from a beam, choosing wardrobe doors without mirrors, or placing the altar on a solid wall. A few are expensive once the house is built, such as moving a toilet or a main door. As a guide, ClickBina's ceiling guide prices boxing in a beam at RM15–RM30 per running ft, while relocating a toilet drain adds RM2,000–RM5,000.
Many Malaysian homeowners bring feng shui preferences to a renovation, some from their own beliefs and some to respect parents or future buyers. ClickBina's Chinese altar cabinet guide puts it plainly: following these conventions is a household decision, and plenty of Malaysian Chinese families take them seriously while plenty of others do not. This page takes no side. It lists the questions owners raise most often and what each one means for the builder.
The timing matters more than the request. Almost everything is easy and cheap at the drawing stage, and expensive once walls, pipes and ceilings are in place. Tell the contractor and the designer at the first meeting, not after the tiles are laid.
| Request | Practical options | What drives the cost |
|---|---|---|
| Main door in line with the back door or the stairs | A foyer screen, shoe cabinet or partition between them | Carpentry or partition size |
| No beam over the bed, sofa or desk | Move the furniture, or box the beam into a plaster bulkhead or ceiling | Running length of the box, lighting |
| No mirror facing the bed | Plain or glass wardrobe doors, a mirror inside a door, or a mirror on a side wall | Door type chosen |
| Stove not opposite the sink or facing the door | Change the layout at design stage: L-shape, island or a shifted hob | Cabinet run, gas and exhaust routes |
| Toilet not facing the main door or above the kitchen | Change the door swing, add a screen, or relocate the toilet | Relocating the drain is the costly part |
| Altar on a solid wall, not under stairs or beside a toilet | Choose the wall early; plan power, ventilation and the cabinet | Cabinet size and timber |
| Start work on a chosen date | Agree the start date before the schedule is fixed | Usually none, if raised early |
A common request is that the main door should not look straight through the house to the back door, or straight up the staircase. In a terrace house the front and back doors often line up by design, so the usual answer is a screen rather than moving a door: a full-height shoe cabinet, a slatted timber or glass partition, or a feature wall that defines a small foyer. ClickBina's foyer and entrance design guide shows how to fit storage, a bench and a mirror into that zone.
Changing the main door itself, its swing or its material is a separate job. ClickBina's main door design guide compares timber, steel and security doors; moving the opening in an external wall is structural and goes through a professional engineer.
Many owners do not want to sleep or sit directly under an exposed beam. There are two practical answers. The cheapest is to move the bed, sofa or desk out from under it at the layout stage. The other is to hide the beam: a plaster bulkhead that boxes it in, or a flat or cove ceiling that runs across it so the beam disappears. ClickBina's plaster ceiling design guide prices both and notes that boxes hiding valves, junction boxes or aircon trunking need access panels.
A beam is part of the structure, so it is boxed in, never cut or hacked. If a beam really is in the wrong place for a new layout, that is a question for a professional engineer, not a carpenter.
ClickBina's mirrored wardrobe doors guide notes that many households prefer a mirror not to face the bed directly, for comfort at night or for feng shui reasons, and that it is far cheaper to decide this before the wardrobe is built. Options are plain laminate or glass doors on the bed side, a full-length mirror on the inside of one door, or a mirror on a side wall or in the walk-in area instead.
Requests in the kitchen usually concern the hob: not directly opposite the sink, not under a window and not facing the kitchen door. These are layout decisions, so they belong at the design stage. ClickBina's kitchen layout guide compares L-shape, U-shape, galley and island layouts, and each gives a different answer to where the hob and sink sit.
Moving the hob after the kitchen is built means moving the gas point, the hood and its ducting, and often the electrical points, so it costs much more than planning it once.
Some owners prefer that a toilet door does not face the main door, the dining table or the kitchen, or that a toilet does not sit above the kitchen or an altar. The door is easy: change the swing, use a sliding door, or add a short screen wall. The toilet itself is not, because its drain is cast into the slab. ClickBina's guide to moving a toilet, sink or shower explains why relocating the drain is the expensive part and why waterproofing has to be redone.
Families with an ancestral or deity altar usually want it against a solid wall, facing an open space, and away from a toilet wall, the underside of the stairs or a bedroom door. The practical points are the same whatever the belief: a wall strong enough for the cabinet, a power point for the lamps, ventilation for incense smoke, and a ceiling that will not stain. ClickBina's altar cabinet design guide shows cabinet styles, and the altar cabinet cost guide explains how the two traditional rulers apply to different parts of the cabinet.
| Item | Indicative price (Klang Valley, 2026) | Source guide |
|---|---|---|
| Box a beam or services in a plaster bulkhead, per running ft | RM15 – RM30 | Plaster ceiling design guide |
| Perimeter cove or L-box ceiling with light channel, per sq ft | RM15 – RM25 | Plaster ceiling design guide |
| Hollow-core bedroom door, supply and install | RM250 – RM600 | Door widening guide |
| RC lintel for a new opening in a brick partition | RM300 – RM800 | Door widening guide |
| Make-good after hacking, per opening | RM800 – RM2,500 | Door widening guide |
| Relocating a toilet drain (core-drilling) | RM2,000 – RM5,000 extra | Moving a toilet, sink or shower guide |
| Standard three-door built-in wardrobe | RM2,500 – RM6,000 | Mirrored wardrobe doors guide |
| Replace a solid timber main door | RM1,000 – RM3,500 | Main door design guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We plan the layout, ceilings, carpentry and doors around the preferences you give us, without judging them, and flag early which ones change the structure or the plumbing. Structural changes go through a professional engineer. WhatsApp us your job details for a quote: the area, the property type and what you want changed. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every figure is quoted unchanged from the ClickBina guide named beside it; they are indicative Klang Valley ranges, not a quotation. This page describes common owner requests and building options; it does not give feng shui advice or say whether any convention works.