Won a lelong house, or about to bid on one you cannot see inside? Here is how to read its condition from the outside, what each condition band costs to put right, and what to do first once you get the keys.

Budget a lelong (auction) house by its likely condition, because you usually cannot go inside before you bid. A unit that only needs a full repaint, a deep clean and repairs typically costs RM6,000 – RM12,000 for a condo and RM10,000 – RM20,000 for a terrace house. One with a dated kitchen and bathrooms runs RM18,000 – RM40,000 (condo) or RM30,000 – RM70,000 (terrace). If the wiring and pipes are also at the end of their life, add a rewire and re-pipe: about RM28,500 – RM59,500 for a condo and RM48,500 – RM101,000 for a double-storey terrace (indicative Klang Valley ranges for 2026, built from our cost guides below). Leaks, termites or structural cracks need a survey before anyone can price them. ClickBina handles whole-house refurbishment and coordinates the trades: WhatsApp us exterior photos for a free quote.
An auction (lelong) property is sold by the bank or through the court after the owner defaults, and you buy it as it stands. Our auction property guide puts the main risk plainly: there is no interior inspection before bidding, so you are buying in “as-is” condition, and hidden defects such as leaks, electrical problems and structural issues are your risk. The auction process guide adds that most auction properties need at least basic refurbishment once you have the keys.
There are practical reasons the condition is often worse than a normal sub-sale house on the same street:
None of this makes an auction house a bad buy. It means the renovation budget is part of the bid, not something you work out after you win.
You can almost always look at the outside, and it tells you more than people expect. Visit in daylight, and again after heavy rain if you can. Take photos from the road and the back lane. Our house viewing water damage checklist explains how to read stains and cracks. What each sign usually means:
| What you can see from outside | What it suggests | Typical cost line (see our guides) |
|---|---|---|
| Sagging roof line, missing or broken tiles | The roof is letting water in; the ceiling and wiring below may already be wet | Replacing cracked or broken tiles RM600 – RM2,500 (roof repair cost guide) |
| Rusted, sagging or collapsed gutters | Rainwater is overflowing onto walls and the porch | Gutter / downpipe repair RM300 – RM1,500 |
| Dark stains under the eaves or the balcony slab | Long-running leaks from the roof, a balcony or a bathroom above | Waterproofing: budget condition band C and survey after you get the keys |
| Cracks on the external wall | Hairline cracks are usually cosmetic; wide or diagonal ones need an engineer | External wall crack repair + repaint RM800 – RM3,500 per wall |
| Termite mud tubes along the plinth or the porch | Active termites at ground level; timber inside may be damaged | Corrective soil treatment RM1,500 – RM4,000 |
| Rusted grilles, gate or awning frame | Years without repainting; the steel may be past saving | Mild steel window grille RM80 – RM130 per sq ft if replaced |
| Overgrown compound, blocked drains, rubbish | Months or years empty; possible pests and stagnant water | Clearing and drain unclogging, quoted on site |
| Water or electricity meter missing or removed | Supply may be cut; reconnection has its own steps | Note it, then ask the utility after you win |
Send us a photo of the job on WhatsApp — we reply within the hour with a free quote.
💬 Get Your Free QuoteThe cost lines come from our roof repair cost guide, the gutter and downpipe repair guide, our property inspection guide (for wall cracks), the termite treatment guide and our metal grille cost guide. A crack wider than 3 mm or still growing needs an engineer before anyone repairs it; see structural crack repair. Blocked drains are covered in clogged drain cleaning.
For a condo, look at the common areas as well: the lift lobby, corridor ceiling and stairwell tell you how the building is maintained. Check whether the unit door and grille look intact, and ask the management office what they are allowed to tell you about the unit.
Because you are bidding on a house you have not been inside, it helps to put it in a condition band. Bands A and B use the scope tiers from our rental unit refurbishment cost guide. Band C adds a full rewire from the house rewiring cost guide and concealed PPR re-piping from the re-piping cost guide. All are indicative Klang Valley ranges for 2026.
| Band | What it looks like | Condo | Terrace house |
|---|---|---|---|
| A — cosmetic | Sound but tired: full repaint, deep clean, all repairs, worn fixtures replaced | RM6,000 – RM12,000 | RM10,000 – RM20,000 |
| B — tired | Band A plus a kitchen refresh, bathroom retile/re-seal, new flooring and fixtures | RM18,000 – RM40,000 | RM30,000 – RM70,000 |
| C — neglected | Band B plus a full rewire and concealed PPR re-piping (services at the end of their life) | RM28,500 – RM59,500 | RM48,500 – RM101,000 (double-storey) |
| D — damaged | Active leaks, termite damage or structural cracks | Survey first; no reliable band | Survey first; no reliable band |
How band C is built: for a condo, RM18,000 – RM40,000 (band B) + RM6,000 – RM12,000 (full rewire, 2–3 bedroom condo) + RM4,500 – RM7,500 (concealed PPR re-piping, condo) = RM28,500 – RM59,500. For a double-storey terrace, RM30,000 – RM70,000 (band B) + RM12,000 – RM20,000 (full rewire) + RM6,500 – RM11,000 (concealed PPR re-piping, terrace) = RM48,500 – RM101,000. A single-storey terrace rewire is lower, at RM8,000 – RM15,000.
An older landed house may also need its whole envelope waterproofed (roof, walls, wet areas and the damp-proof course together). Our old house waterproofing guide puts a whole-envelope campaign at RM12,000 – RM50,000+, and it is always survey-led, so keep it as a separate line rather than part of band C.
These bands are for refurbishing, not redesigning. If you plan a proper renovation, with a new kitchen, new floors throughout and rebuilt bathrooms, budget by floor area instead: the renovation cost calculator uses roughly RM50–90 per sq ft for a light refresh, RM90–150 for full mid-range and RM150–220+ for premium. The full renovation cost guide breaks that down by home type.
Decide your ceiling before auction day, on paper, and do not move it in the room. A simple way to set it:
Maximum bid = realistic market value after the works − renovation budget for the band − inherited costs − contingency.
Two contingency figures appear in our guides, and they measure different things. The auction property guide says to budget a buffer of at least 5–10% of the bid price to cover inherited costs and renovation. The property flipping guide warns that hidden defects (waterproofing, electrical, plumbing) can destroy margins and says to budget a 15–20% contingency. The first is a floor for the whole purchase; the second is the cushion a flipper keeps for renovation overruns. On a house you have not seen inside, plan for both: the buffer on the purchase and a separate cushion for renovation surprises.
Once the house is legally yours and empty, the first fortnight is about making it safe and finding out what you really bought. Do these before any renovation starts:
| First-fortnight job | Indicative cost (2026, Klang Valley) | Source guide |
|---|---|---|
| Lockset / door knob replacement | RM50 – RM120 labour, hardware RM30 – RM150 extra | Lock replacement |
| Digital lock fitted (lock supplied by you) | RM250 – RM350 labour | Lock replacement |
| Electrical safety check: condo / small unit | RM150 – RM400 | Electrical safety inspection |
| Full electrical inspection & test report: landed home | RM400 – RM900 | Electrical safety inspection |
| Water tank clean (drain, scrub, refill) | RM150 – RM400 | Our water tank cost guide |
| New 500–1,000 L poly roof tank, installed | RM800 – RM1,800 | Our water tank cost guide |
| Termite inspection | Free – RM200 | Termite treatment |
| Move-in deep clean | RM250 – RM400 studio, RM400 – RM650 3-bedroom condo, RM600 – RM900+ terrace | Move-in cleaning |
If the electrical check finds problems, the fix is priced after the findings, often a new consumer unit or a partial or full rewire. If the termite inspection finds activity, corrective soil treatment is typically RM1,500 – RM4,000 and a baiting system RM2,500 – RM6,000 including the first year of monitoring.
The expensive mistake is doing the visible work first. New paint over a wet wall blisters; new tiles laid before the pipes are replaced get hacked up again. The order that avoids paying twice:
Waterproofing and rewiring go before paint for the same reason: both mean opening surfaces. Our old house waterproofing guide has a priority ladder for when the budget will not stretch to everything, and our old house renovation guide explains the full sequence for houses 30 to 50 years old.
| Condo / apartment | Landed (terrace, semi-D) | |
|---|---|---|
| Who controls the works | Building management: renovation permit, working hours, lift booking, renovation deposit | You; structural or external changes need local council approval |
| Typical renovation deposit | RM500 – RM3,000, refundable after final inspection (strata renovation rules guide) | No management deposit; check what the local council requires for structural works |
| Most likely hidden problems | Bathroom leaks into the unit below, tired wiring, dated kitchen | Roof and gutters, termites, rising damp, galvanised pipes, rusted grilles |
| What to ask before bidding | Whether the management can tell you about arrears and any leak complaints | Whether the compound, roof and drains show years of neglect |
In a condo, apply to the management before any work starts and follow the strata renovation rules. Any arrears the Conditions of Sale leave with you are a matter for the management and your lawyer; settle how they will be handled before you plan the works.
How far to go depends on what the house is for:
This is a renovation guide, not legal advice. Deposits, the Proclamation and Conditions of Sale, LACA versus court auctions and payment deadlines are covered in the step-by-step auction process guide and the auction property guide linked above, with official sources. Getting an occupied unit back means negotiating with the occupants first and applying to court if that fails; the eviction process guide explains the court steps from a landlord's side. Court auctions are listed on the judiciary's e-Lelong portal. Take a lawyer's advice on all of these before you bid, and do not start works until the property is legally yours and vacant.
We handle whole-house refurbishment and coordinate the trades, for auction, old, vacant and inherited houses across the Klang Valley. Before you bid, WhatsApp us photos of the outside: the roof line, the gutters, the walls, the grilles and, for a condo, the corridor and the unit door, for a free quote. After you get vacant possession, a site visit is RM150, waived if you go ahead. The price is flat, with no hidden charges, and we reply within the hour.
Jobs we take on include hacking and re-tiling, mould treatment, grilles, water tank supply and cleaning, drain unclogging, cabinet refacing, and move-in and post-renovation cleaning.
Some jobs in an old or neglected house have legal requirements of their own. Electrical work must be carried out by a wireman registered with Suruhanjaya Tenaga (the Energy Commission), and termite treatment by a pest control operator licensed by the Pesticides Board. Ask for those registrations whoever does the work.
The legal side of an auction purchase is set by the law and the official bodies below. Rules, fees and procedures change — always confirm the current position with the source or your lawyer:
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina cost guide named beside it (rental refurbishment tiers, house rewiring, re-piping, roof repair, gutter repair, property inspection, termite treatment, locks, electrical inspection, water tank, metal grilles, cleaning and strata renovation rules). Those are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates. The band C totals are simple sums of the ranges shown in the band table, with the working printed under it. Band D and anything behind a closed door can only be priced after a site survey.