Renovating a Lelong House in Malaysia: Costs & What to Fix First
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔨 Auction Property · Renovation

Renovating an Auction (Lelong) House
What It Usually Needs and What It Costs

Won a lelong house, or about to bid on one you cannot see inside? Here is how to read its condition from the outside, what each condition band costs to put right, and what to do first once you get the keys.

Neglected terrace house exterior with rusted grilles and a sagging gutter, before renovation

Budget a lelong (auction) house by its likely condition, because you usually cannot go inside before you bid. A unit that only needs a full repaint, a deep clean and repairs typically costs RM6,000 – RM12,000 for a condo and RM10,000 – RM20,000 for a terrace house. One with a dated kitchen and bathrooms runs RM18,000 – RM40,000 (condo) or RM30,000 – RM70,000 (terrace). If the wiring and pipes are also at the end of their life, add a rewire and re-pipe: about RM28,500 – RM59,500 for a condo and RM48,500 – RM101,000 for a double-storey terrace (indicative Klang Valley ranges for 2026, built from our cost guides below). Leaks, termites or structural cracks need a survey before anyone can price them. ClickBina handles whole-house refurbishment and coordinates the trades: WhatsApp us exterior photos for a free quote.

Why lelong houses usually need more work than a sub-sale

An auction (lelong) property is sold by the bank or through the court after the owner defaults, and you buy it as it stands. Our auction property guide puts the main risk plainly: there is no interior inspection before bidding, so you are buying in “as-is” condition, and hidden defects such as leaks, electrical problems and structural issues are your risk. The auction process guide adds that most auction properties need at least basic refurbishment once you have the keys.

There are practical reasons the condition is often worse than a normal sub-sale house on the same street:

  • Maintenance usually stops first. An owner who has fallen behind on the loan rarely spends on a leaking roof, a failing water heater or a blocked drain.
  • The unit may have stood empty for months, sometimes years. Empty houses grow mould in closed rooms, the water in the tank and pipes goes stale, and termites work undisturbed.
  • Or it may still be occupied by the previous owner or a tenant, which means you only see it after they leave, and sometimes after contents are left behind.
  • Nobody is giving you a defect list. A sub-sale seller can be asked questions and a new house has a defect liability period. An auction unit has neither.

None of this makes an auction house a bad buy. It means the renovation budget is part of the bid, not something you work out after you win.

What you can check before bidding, without going inside

You can almost always look at the outside, and it tells you more than people expect. Visit in daylight, and again after heavy rain if you can. Take photos from the road and the back lane. Our house viewing water damage checklist explains how to read stains and cracks. What each sign usually means:

What you can see from outsideWhat it suggestsTypical cost line (see our guides)
Sagging roof line, missing or broken tilesThe roof is letting water in; the ceiling and wiring below may already be wetReplacing cracked or broken tiles RM600 – RM2,500 (roof repair cost guide)
Rusted, sagging or collapsed guttersRainwater is overflowing onto walls and the porchGutter / downpipe repair RM300 – RM1,500
Dark stains under the eaves or the balcony slabLong-running leaks from the roof, a balcony or a bathroom aboveWaterproofing: budget condition band C and survey after you get the keys
Cracks on the external wallHairline cracks are usually cosmetic; wide or diagonal ones need an engineerExternal wall crack repair + repaint RM800 – RM3,500 per wall
Termite mud tubes along the plinth or the porchActive termites at ground level; timber inside may be damagedCorrective soil treatment RM1,500 – RM4,000
Rusted grilles, gate or awning frameYears without repainting; the steel may be past savingMild steel window grille RM80 – RM130 per sq ft if replaced
Overgrown compound, blocked drains, rubbishMonths or years empty; possible pests and stagnant waterClearing and drain unclogging, quoted on site
Water or electricity meter missing or removedSupply may be cut; reconnection has its own stepsNote it, then ask the utility after you win

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

The cost lines come from our roof repair cost guide, the gutter and downpipe repair guide, our property inspection guide (for wall cracks), the termite treatment guide and our metal grille cost guide. A crack wider than 3 mm or still growing needs an engineer before anyone repairs it; see structural crack repair. Blocked drains are covered in clogged drain cleaning.

For a condo, look at the common areas as well: the lift lobby, corridor ceiling and stairwell tell you how the building is maintained. Check whether the unit door and grille look intact, and ask the management office what they are allowed to tell you about the unit.

Condition bands and what each usually costs

Because you are bidding on a house you have not been inside, it helps to put it in a condition band. Bands A and B use the scope tiers from our rental unit refurbishment cost guide. Band C adds a full rewire from the house rewiring cost guide and concealed PPR re-piping from the re-piping cost guide. All are indicative Klang Valley ranges for 2026.

BandWhat it looks likeCondoTerrace house
A — cosmeticSound but tired: full repaint, deep clean, all repairs, worn fixtures replacedRM6,000 – RM12,000RM10,000 – RM20,000
B — tiredBand A plus a kitchen refresh, bathroom retile/re-seal, new flooring and fixturesRM18,000 – RM40,000RM30,000 – RM70,000
C — neglectedBand B plus a full rewire and concealed PPR re-piping (services at the end of their life)RM28,500 – RM59,500RM48,500 – RM101,000 (double-storey)
D — damagedActive leaks, termite damage or structural cracksSurvey first; no reliable bandSurvey first; no reliable band

How band C is built: for a condo, RM18,000 – RM40,000 (band B) + RM6,000 – RM12,000 (full rewire, 2–3 bedroom condo) + RM4,500 – RM7,500 (concealed PPR re-piping, condo) = RM28,500 – RM59,500. For a double-storey terrace, RM30,000 – RM70,000 (band B) + RM12,000 – RM20,000 (full rewire) + RM6,500 – RM11,000 (concealed PPR re-piping, terrace) = RM48,500 – RM101,000. A single-storey terrace rewire is lower, at RM8,000 – RM15,000.

An older landed house may also need its whole envelope waterproofed (roof, walls, wet areas and the damp-proof course together). Our old house waterproofing guide puts a whole-envelope campaign at RM12,000 – RM50,000+, and it is always survey-led, so keep it as a separate line rather than part of band C.

These bands are for refurbishing, not redesigning. If you plan a proper renovation, with a new kitchen, new floors throughout and rebuilt bathrooms, budget by floor area instead: the renovation cost calculator uses roughly RM50–90 per sq ft for a light refresh, RM90–150 for full mid-range and RM150–220+ for premium. The full renovation cost guide breaks that down by home type.

Build the renovation into your maximum bid

Decide your ceiling before auction day, on paper, and do not move it in the room. A simple way to set it:

Maximum bid = realistic market value after the works − renovation budget for the band − inherited costs − contingency.

  • Market value: what comparable, renovated units in the same development or street have actually sold for, not asking prices.
  • Renovation budget: the band you have put the house in from the outside. If you are unsure, plan for band C.
  • Inherited costs: whatever the Conditions of Sale pass to you, such as maintenance, quit rent or assessment arrears, plus the legal costs of getting vacant possession. The auction process guide explains how to read them; confirm with your lawyer.
  • Contingency: see below.

Two contingency figures appear in our guides, and they measure different things. The auction property guide says to budget a buffer of at least 5–10% of the bid price to cover inherited costs and renovation. The property flipping guide warns that hidden defects (waterproofing, electrical, plumbing) can destroy margins and says to budget a 15–20% contingency. The first is a floor for the whole purchase; the second is the cushion a flipper keeps for renovation overruns. On a house you have not seen inside, plan for both: the buffer on the purchase and a separate cushion for renovation surprises.

The first two weeks after you get the keys

Once the house is legally yours and empty, the first fortnight is about making it safe and finding out what you really bought. Do these before any renovation starts:

  1. Change or rekey the locks. You have no idea how many keys are out there. See rekeying vs replacing locks.
  2. Photograph everything, room by room, before anything is moved. It helps with your contractor's scope and with any dispute about what was there.
  3. Deal with anything left behind carefully. Goods the previous occupant left can raise legal questions. Our guide to a tenant abandoning a rented unit explains the risks for landlords; ask your lawyer how they apply to an auction purchase before you dispose of anything valuable.
  4. Get the wiring tested before the power goes back on. Water from a leaking roof and years of damp are the worst conditions for old wiring. Book an electrical safety inspection first.
  5. Check the water tank and pipes. Drain and flush stale water; a tank that has stood for months usually needs a clean, and a cracked old tank a replacement.
  6. Look for termites before stored boxes and new cabinets go in. A termite inspection tells you whether the evidence is active.
  7. Book a deep clean of the empty unit so the survey and the quote are done on clean surfaces.
First-fortnight jobIndicative cost (2026, Klang Valley)Source guide
Lockset / door knob replacementRM50 – RM120 labour, hardware RM30 – RM150 extraLock replacement
Digital lock fitted (lock supplied by you)RM250 – RM350 labourLock replacement
Electrical safety check: condo / small unitRM150 – RM400Electrical safety inspection
Full electrical inspection & test report: landed homeRM400 – RM900Electrical safety inspection
Water tank clean (drain, scrub, refill)RM150 – RM400Our water tank cost guide
New 500–1,000 L poly roof tank, installedRM800 – RM1,800Our water tank cost guide
Termite inspectionFree – RM200Termite treatment
Move-in deep cleanRM250 – RM400 studio, RM400 – RM650 3-bedroom condo, RM600 – RM900+ terraceMove-in cleaning

If the electrical check finds problems, the fix is priced after the findings, often a new consumer unit or a partial or full rewire. If the termite inspection finds activity, corrective soil treatment is typically RM1,500 – RM4,000 and a baiting system RM2,500 – RM6,000 including the first year of monitoring.

The order of work: dry and safe first, paint last

The expensive mistake is doing the visible work first. New paint over a wet wall blisters; new tiles laid before the pipes are replaced get hacked up again. The order that avoids paying twice:

  1. Make it safe and dry: wiring tested, roof and gutter leaks stopped, termites treated.
  2. Services: rewiring and re-piping while walls and floors can still be opened.
  3. Waterproofing and wet areas: bathrooms, kitchen and any balcony or flat roof.
  4. Finishes: hacking and re-tiling, carpentry and cabinets, then paint.
  5. Final clean: a post-renovation clean, typically RM500 – RM800 for a studio or 1-bedroom unit, RM800 – RM1,300 for a 3-bedroom condo and RM1,000 – RM1,800 for a terrace house.

Waterproofing and rewiring go before paint for the same reason: both mean opening surfaces. Our old house waterproofing guide has a priority ladder for when the budget will not stretch to everything, and our old house renovation guide explains the full sequence for houses 30 to 50 years old.

Condo vs landed lelong units: what changes

Condo / apartmentLanded (terrace, semi-D)
Who controls the worksBuilding management: renovation permit, working hours, lift booking, renovation depositYou; structural or external changes need local council approval
Typical renovation depositRM500 – RM3,000, refundable after final inspection (strata renovation rules guide)No management deposit; check what the local council requires for structural works
Most likely hidden problemsBathroom leaks into the unit below, tired wiring, dated kitchenRoof and gutters, termites, rising damp, galvanised pipes, rusted grilles
What to ask before biddingWhether the management can tell you about arrears and any leak complaintsWhether the compound, roof and drains show years of neglect

In a condo, apply to the management before any work starts and follow the strata renovation rules. Any arrears the Conditions of Sale leave with you are a matter for the management and your lawyer; settle how they will be handled before you plan the works.

Renovate to live, rent or resell?

How far to go depends on what the house is for:

  • To live in: do the full sequence above once, properly. Services and waterproofing are the part you cannot redo cheaply later.
  • To rent out: renovate for durability and yield, not taste. See renovating to rent and the rental refurbishment tiers above.
  • To resell: spend where buyers see value: see renovations that add property value. The property flipping guide covers RPGT and margin, which decide whether a quick resale works at all.

This is a renovation guide, not legal advice. Deposits, the Proclamation and Conditions of Sale, LACA versus court auctions and payment deadlines are covered in the step-by-step auction process guide and the auction property guide linked above, with official sources. Getting an occupied unit back means negotiating with the occupants first and applying to court if that fails; the eviction process guide explains the court steps from a landlord's side. Court auctions are listed on the judiciary's e-Lelong portal. Take a lawyer's advice on all of these before you bid, and do not start works until the property is legally yours and vacant.

How ClickBina quotes a unit you cannot enter yet

We handle whole-house refurbishment and coordinate the trades, for auction, old, vacant and inherited houses across the Klang Valley. Before you bid, WhatsApp us your job details for the outside: the roof line, the gutters, the walls, the grilles and, for a condo, the corridor and the unit door, for a free quote. After you get vacant possession, a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. The price is flat, with no hidden charges, and we reply within the hour.

Jobs we take on include hacking and re-tiling, mould treatment, grilles, water tank supply and cleaning, drain unclogging, cabinet refacing, and move-in and post-renovation cleaning.

Some jobs in an old or neglected house have legal requirements of their own. Electrical work must be carried out by a wireman registered with Suruhanjaya Tenaga (the Energy Commission), and termite treatment by a pest control operator licensed by the Pesticides Board. Ask for those registrations whoever does the work.

Sources & official references

The legal side of an auction purchase is set by the law and the official bodies below. Rules, fees and procedures change — always confirm the current position with the source or your lawyer:

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina cost guide named beside it (rental refurbishment tiers, house rewiring, re-piping, roof repair, gutter repair, property inspection, termite treatment, locks, electrical inspection, water tank, metal grilles, cleaning and strata renovation rules). Those are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates. The band C totals are simple sums of the ranges shown in the band table, with the working printed under it. Band D and anything behind a closed door can only be priced after a site survey.

Common Questions

Can I see inside a lelong house before I bid?
Usually not. In most auctions you can only look at the outside, because the unit may still be occupied or locked. Check the roof, gutters, walls, grilles and drains from outside, and if you cannot tell, budget as if the house is in condition band C, with the wiring and pipes needing replacement.
How much should I budget to renovate a lelong house?
By condition: RM6,000 – RM12,000 for a condo and RM10,000 – RM20,000 for a terrace that only needs a full repaint, deep clean and repairs; RM18,000 – RM40,000 (condo) or RM30,000 – RM70,000 (terrace) with a kitchen and bathroom refresh; and about RM28,500 – RM59,500 (condo) or RM48,500 – RM101,000 (double-storey terrace) if it also needs rewiring and re-piping. Leaks, termites and structural cracks need a survey first.
The lelong house has been empty for years. What usually spoils first?
Water and damp. Roof leaks and blocked gutters wet the ceilings and walls, closed rooms grow mould, the water in the tank and pipes goes stale, and termites work undisturbed. Old wiring suffers from the damp too, which is why it should be tested before the power is switched back on.
Is it safe to switch on the electricity in a house that was empty for a long time?
Not until the wiring has been tested. Have a wireman registered with Suruhanjaya Tenaga (the Energy Commission) inspect the installation first, especially if the roof has leaked. An electrical safety check costs RM150 – RM400 for a condo or small unit and RM400 – RM900 for a full inspection and test report on a landed home.
Can I start renovating before I get the keys and vacant possession?
No. Wait until the purchase is completed and the property is legally yours and empty. Getting an occupied unit back is a legal process, so take your lawyer's advice. You can prepare before then: exterior photos, a quote range and a plan for the first two weeks.
Is a bank-repossessed house the same as a lelong house?
In practice, yes. When a borrower defaults, the bank or financial institution enforces its security and sells the property at public auction, which is what lelong means. The renovation questions are the same; the legal steps are in our auction process guide.
Should I renovate a lelong house to rent or to sell?
It depends on the numbers. For renting, renovate for durability and yield rather than taste. For a resale, spend only where buyers see value, and check RPGT and your margin first. For living in, do the services and waterproofing once, properly, before the finishes.
Can you quote on WhatsApp before I bid?
Yes. WhatsApp us your job details for the outside, such as the roof line, gutters, walls, grilles and, for a condo, the corridor and unit door, for a free quote. After vacant possession, a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. The price is flat, with no hidden charges.