Fitting out a shop, cafe or restaurant? Here is how to choose the indoor unit type for your ceiling, layout and business.
📍 We serve KL, Selangor & Putrajaya.

For most shops and restaurants the choice is between ceiling cassettes (flush in a false ceiling, blowing four ways), ceiling-concealed ducted units (hidden, with diffusers and a return grille) and ceiling-exposed units (a visible box under the ceiling, for spaces with no false ceiling). Ceiling height, whether there is a false ceiling, kitchen grease, noise and how easy the unit is to service decide which fits. ClickBina's aircon types guide lists a ceiling cassette at RM2,800 – RM6,000 for the unit and RM800 – RM1,500 to install (indicative 2026, Klang Valley).
Commercial spaces rarely use wall splits, because shop walls are taken by shelving, signage and glass. ClickBina's ducted and cassette service guide describes what you see from the floor with each type:
Larger premises may instead have an air-handling unit or a VRF system serving many indoor units, which is a design exercise of its own.
| Point | Ceiling cassette | Ducted (concealed) | Ceiling-exposed |
|---|---|---|---|
| Needs a false ceiling | Yes | Yes, with enough void for unit and ducts | No |
| What customers see | A grille in the ceiling | Diffusers only | A box under the ceiling |
| Air spread | Four ways from one point | Wherever the diffusers go | Along the ceiling in one direction |
| Suits | Open shop floors, dining halls | Design-led interiors, long or odd shapes | Exposed ceilings, retrofits, back-of-house |
| Servicing | From below, over the floor | Through an access panel; ducts too | Like a wall unit, but at height |
| Drainage | Usually pumped | Usually pumped | Often gravity, depending on route |
The ceiling often makes the decision. A cassette and a ducted unit both need a false ceiling to sit in, and a ducted system also needs enough depth in the void for the unit, the ducts and the return path. Many cafes and shops now leave the slab exposed and painted, which rules those two out unless you add a bulkhead; a ceiling-exposed unit or exposed ducting is the usual answer there.
ClickBina's aircon installation cost guide notes that a cassette costs more to install because of the ceiling access and the heavier unit, and needs a false ceiling to house it. Plan the ceiling and the aircon together at fit-out stage rather than cutting a finished ceiling later.
Dining rooms next to an open or semi-open kitchen are the hardest spaces to cool. Heat from the cookline, people coming and going, and doors opening all add load, and the kitchen's exhaust pulls conditioned air out of the dining room if there is no make-up air. Grease in the air also clogs indoor unit filters and coils much faster than in a shop, so place units away from the kitchen pass and plan for more frequent cleaning.
Do not rely on the dining aircon to fix a hot, smoky kitchen. That is an exhaust and make-up air problem; our kitchen exhaust ducting guide covers it.
In retail the priorities are even coverage across the floor, a clean ceiling line and low noise. A cassette grid gives even air on an open floor; ducted units suit a design-led interior where the ceiling is part of the look, or a long narrow shoplot where diffusers can be spread along the length. Keep units away from shopfront glass doors, where the air simply escapes, and away from display lighting that adds heat under it.
Salons and clinics add chemical smells or treatment rooms, which may need separate zones and fresh air rather than one large unit.
In a mall, the landlord's fit-out manual usually decides much of this: whether the unit is served by the mall's own system or you install your own, where outdoor units may go, where condensate may drain and what the ceiling must look like. Read the tenancy design criteria before choosing equipment, and ask the landlord what the unit's existing provision is. Shoplots are simpler, but outdoor unit positions still need the owner's agreement, and sometimes the local council's.
Home sizing rules do not transfer well to commercial space. A restaurant's load depends on the kitchen, the number of covers and how often doors open; a shop's on glazing, lighting and footfall. Use ClickBina's aircon BTU calculator for a first idea, then have the space surveyed. Several smaller units also give you zoning, so part of the space can be switched off when quiet, and one failure does not leave the whole floor without cooling.
These are ClickBina's published ranges (indicative 2026, Klang Valley). Ducted and larger systems are priced after a survey.
| Item | Indicative price | Source guide |
|---|---|---|
| Ceiling cassette, unit | RM2,800 – RM6,000 | Aircon types guide |
| Ceiling cassette, installation | RM800 – RM1,500 | Aircon types guide |
| Ducted / central system | RM8,000 – RM25,000 | Aircon types guide (whole house or large office) |
| Cassette or concealed unit, installation labour | RM700 – RM1,500 | Aircon installation cost guide |
| Extra copper piping, per foot | RM30 – RM60 | Aircon installation cost guide |
| Commercial split or cassette, per-visit servicing | RM80 – RM150 per unit | Ducted and cassette service guide |
| Ceiling cassette chemical wash | RM250 – RM400 per unit | Ducted and cassette service guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteRunning costs matter as much as the install: a restaurant cassette that is cleaned too rarely loses cooling and drips. Budget for a servicing routine from the day it opens.
WhatsApp us your job details for a quote: the floor area, whether there is a false ceiling, the type of business and any landlord requirements. If existing units are not cooling, ClickBina's aircon diagnostic is RM120 – RM400. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We reply within the hour, the price we agree is a flat price with no hidden charges, and any visit fee is confirmed with you on WhatsApp before we come.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not a quote for your premises.