What the Department of Social Welfare actually requires of CCTV in a childcare centre — in its own words, including the exemption most summaries leave out.
📍 We serve KL, Selangor & Putrajaya.

If you are registering or renewing a TASKA, this is the requirement itself, quoted from the Department of Social Welfare’s own registration guide rather than from a news write-up.
Read the bracket in the middle of that quotation, because a great deal of the advice circulating on this subject leaves it out: the checklist itself carves out a home-based TASKA. That is one of the statutory TASKA categories, so the carve-out is substantial rather than a technicality. If you operate from your own home, do not let anyone sell you a system on the basis that registration is impossible without one — and if you are unsure which category your centre falls into, that is a question to put to your JKM officer in writing before you spend anything.
Everything below applies to a TASKA that is inside the requirement.
That distinction is worth holding onto as you read the rest of this page. The registration checklist is what tells you a system is needed; the child-safety guideline is what tells you what the system has to do. When an installer quotes you for “a TASKA package”, the specification below is what the quote has to satisfy.
Two practical consequences follow from that wording, and they are the two that get missed on cheap installations.
The first is that the resolution written on the box is only half the answer. A 1080p camera at the wrong height, aimed too wide, or fighting a bright window behind the subject will not produce an image that shows facial features or the colour of clothing without blurring — and that is what the specification asks for. Resolution, lens coverage, mounting position and lighting all have to work together.
The second is that it should be tested rather than assumed. At handover, walk the room and look at a live and a recorded image from each camera, at the time of day the room is actually used. If the recording does not show what the wording above describes, it is better to find that out with the installer standing next to you than at an inspection.
That is a closed list of named spaces plus a catch-all exercisable by an Authorised Officer. It is not a licence to cover every square metre of the premises, and equally it is not something to trim down — the porch in front of the premises is on the list as surely as the activity area is. Note also what the list quoted above does not name: washrooms and nappy-changing areas are not among the areas it lists, and a camera does not belong in one on the strength of this requirement.
| Area named in the guideline | ClickBina placement note (our engineering view, not part of the requirement) |
|---|---|
| The activity area | Usually the largest room and the one that needs the most thought about coverage overlap; aim away from the brightest window rather than into it |
| The dining area | Watch for high chairs and furniture that block a low mounting; a slightly higher position with a wider view usually reads better |
| The rest area | Often the darkest room in the centre during nap time — check what the image looks like with the lights off and the blinds drawn |
| The kitchen or pantry, if there is one | Heat, steam and grease shorten a camera’s life; mount away from the hob and expect to clean the housing |
| The isolation room or sickbay | Small rooms need a short-focal-length camera in a corner, not a standard lens on the wall opposite |
| The porch area in front of the premises | The one camera guaranteed to face daylight; a housing rated for the exposure and a position that avoids direct sun into the lens |
| Any other area an Authorised Officer directs | Leave spare recorder channels and a cable route so an added camera is a small job rather than a rewire |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteThat last row is the one to plan for. A recorder bought with exactly as many channels as you have cameras is a recorder you replace the first time you are asked to add one.
In practice, blind spots are created by furniture and doors rather than by camera specifications. A tall shelf unit, a door leaf that opens back against a wall, a partition added after the cameras were sited — each of those creates a pocket the camera cannot see. The useful test is to walk the area yourself while somebody watches the live view, and to repeat it after any furniture is moved. It costs nothing and it is the only reliable way to find them.
The specification goes well beyond the cameras themselves. This is the rest of it, quoted rather than summarised, because the detail is the point.
The list above is a requirement on the operator, not on the contractor — but most of it is impossible to satisfy unless the system was built for it. These are the things to ask for by name, in the quote, so that the system you get can actually do them.
That is worth knowing for two reasons. It tells you where to go for an authoritative answer about your own centre — JKM, in writing — rather than to a contractor. And it is a reminder that anybody quoting you “the law says” on this subject is being loose with the wording. The requirement is real and it is federal; it is imposed through the registration checklist and the guideline.
This is the question every TASKA operator asks and it is the one where we are going to give you less than you want, on purpose.
The requirements quoted on this page — from JKM’s own registration guide and its child-safety guideline — do not include a retention period. We are not going to invent one, and you should be sceptical of anyone who quotes you a number of days as though JKM had set it. If you need a definitive answer for your centre, ask your JKM officer in writing and keep the reply.
What follows is ClickBina’s engineering recommendation, not a JKM requirement. Choose the period deliberately, based on how long it realistically takes a concern to surface at a childcare centre — a parent raising something after a weekend, for instance, needs footage that is older than a couple of days. Write the period down, then size the storage to the period rather than letting the disk size decide it for you. Most recorders simply overwrite when the disk fills, which means an unmanaged system quietly gets shorter every time a camera is added.
Recording time is not a property you buy; it is the result of the channel count, the resolution, the bitrate each camera is set to and the hours the system records. Ask your installer to show you that calculation for your own system rather than accepting “it will keep about a month”. Our CCTV installation cost guide covers what moves the number on a system as a whole.
Surveillance-grade drives are what these systems are designed around, and they are ordinary retail items — shelf prices, not an installed rate:
| Drive | Typical retail price (2026) | Notes |
|---|---|---|
| 2TB surveillance hard disk | from RM234 per drive | continuous-write drive (WD Purple / Seagate SkyHawk); a desktop drive voids the warranty |
| 4TB surveillance hard disk | from RM420 per drive | what you need once you want a month of footage rather than a week |
Those are shelf prices for the drive alone, not an installed cost, and they are here so you can sanity-check a line on a quotation. Two practical points that matter more than the price: use a continuous-write surveillance drive rather than a desktop drive, and treat a full disk as normal operation rather than a fault — the question is whether the period you chose still fits on it after the last camera was added.
A recorder that is off is a recorder that satisfies nothing on this page, so the power side deserves more attention than it usually gets in a childcare centre where sockets are deliberately scarce and often protected.
On our own installations the mains connection is done by an Energy Commission-registered electrical contractor, and it is fair to ask any bidder to confirm the same in writing. Beyond that, three practical points for a TASKA: put the recorder somewhere ventilated and out of reach rather than in a sealed cupboard; make sure its supply is not on a circuit that gets switched off at the end of the day; and ask what happens during a power cut, because “the cameras must work throughout the whole time the TASKA operates” is a requirement the guideline states in the block quoted above. If the premises is being rewired anyway, our rewiring guide covers sequencing the two jobs.
A registered TASKA charging fees is a business, and recorded footage of identifiable people is personal data. That brings a second body of rules alongside the JKM requirements.
How that applies to your own centre — and how it interacts with the guideline’s own rules on passwords, on copying footage and on parents viewing it — is something to take advice on, because a childcare setting raises questions an ordinary office does not. What we can tell you is where the practical duties bite for any camera system: notice, security of the recorder, and not keeping footage you no longer need. Those are set out in PDPA, CCTV and biometric compliance.
Almost everything an officer might ask about is a document rather than a piece of hardware, and the documents are far easier to produce if the folder was started at handover.
| Have ready | What it is | Where it comes from |
|---|---|---|
| Proof of installation | The invoice and the handover document for the system | Your installer, at handover |
| Camera schedule and plan | Each camera, where it is and which named area it covers | Ask for it as a deliverable, not an afterthought |
| A working live view and a test export | Someone on site who can display live footage and export a clip without help | Handover training — make sure more than one person can do it |
| The CCTV monitoring log | Maintenance carried out, and the operator’s own periodic review of footage | Started on day one and kept up |
| Password and access arrangements | Who holds the credentials and how access is controlled | Written down at handover, updated when staff change |
| Signage in place | The notice the guideline describes, fixed where it can be read | Agreed as part of the installation scope |
| Maintenance schedule | The agreed service interval and the last visit | Your installer or maintenance provider |
A quote in that shape can be compared with another quote and can be handed to whoever is registering the centre. A single line reading “8 CCTV camera package” cannot.
ClickBina installs CCTV for childcare centres, offices, shops and homes across Kuala Lumpur and Selangor. On a TASKA job our approach is narrow and specific: quote the requirement in JKM’s own words rather than a summary of it, site the cameras against the named areas, prove the image quality and the export at handover, and hand over the documentation the folder needs. We do not publish a price for this work — the number depends on the premises, the cable routes and where the power is — so we survey it and quote it itemised. See our electrical and plumbing services, or send your job details or a floor plan on WhatsApp and we will quote after a site survey.
This guide sets out what the wording we verified actually says, and what to do about it. It is information, not advice on your own situation. A specific situation — your building, your premises, your documents and your dates — needs a professional adviser who has read them, and you should take that advice before you rely on anything here.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteThis guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:
Tell us what you need — we reply within the hour.