Why a condominium camera install is a permission problem before it is a cabling problem — the routes that work, the walls you cannot cut, and what a real quote itemises.
📍 We serve KL, Selangor & Putrajaya.

In a landed house the cabling question is a budget question: chase the wall and pay more, or run surface trunking and pay less. In a condominium it is a permission question first and a budget question second. The wall between your entrance door and the lift lobby is not yours. The ceiling void above the corridor is not yours. The riser that carries the building’s services is not yours, and in most buildings it is locked. What you actually own is the inside of your parcel, and everything a camera cable does outside that line needs somebody else’s written agreement before a drill comes out of the bag.
That single fact reorders the whole job. A contractor who quotes you a condo camera install the same way he quotes a terrace house has not thought about it, and the first sign of that is a quote with no line for management approval, no note about the riser, and a cheerful assumption that the corridor wall is available. The second sign is a crew that turns up on the day and starts drilling, which is how a job gets stopped by the guardhouse at 10am and how a deposit gets forfeited.
Every camera cable in a condo takes one of two routes, and the honest comparison is not “neat versus ugly” — it is about what you are allowed to do, how fast it can be undone, and what the wall looks like when you move out.
| Surface trunking / PVC casing | Concealed in the wall or ceiling | |
|---|---|---|
| What happens to the wall | Nothing. The casing is glued or plugged to the surface and the cable sits inside it | The wall is cut, a conduit is laid, the chase is re-plastered and the finish is made good |
| Typical approval position | Straightforward inside your own parcel; still needs approval anywhere on common property | Refused outright on any structural wall, and normally refused on common property in any form |
| Time on site | Hours | Days, because plaster and paint have to cure between visits |
| Reversibility | High — unclip the casing, fill a few plugs, repaint | Low. The chase is permanent whether or not the camera stays |
| What it costs to add a camera later | Low. Pull a new cable through the same run | High, unless spare conduit and a draw wire were laid at the start |
| How it looks | Visible casing, which can be run along a skirting or a ceiling line and painted out | Invisible, which is the entire point |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteThere is a third route that is neither, and in a condo it is often the right one: run the cable inside an existing false ceiling or above a bulkhead, so it is hidden without cutting anything. If your unit already has a plaster ceiling in the living area or the corridor inside the parcel, that void is the cheapest concealment you will ever get, and it should be the first thing anyone surveying the job looks at.
These are market bands published by other Klang Valley operators, not figures ClickBina publishes (market estimate 2026, indicative Klang Valley). Read the source note under the table before you use them to argue with anyone, because the two cabling rows do not come from the same place.
| Work | Market range (2026, Klang Valley) | Notes |
|---|---|---|
| Cabling, surface / PVC trunking | RM150 – RM250 per point | cable run in surface casing at accessible heights — the fast, cheap route |
| Cabling, concealed in the wall | RM250 – RM500 per point | wall cut, conduit laid, re-plastered; repainting is normally not included |
| Drilling through brick or concrete | RM50 – RM120 per hole | added where a run has to cross a structural wall |
| Add one camera to an existing system | RM300 – RM400 per camera | cabling and installation for one more point; the camera itself is on top |
| Install a camera you already own | RM80 – RM150 per camera | mount, aim and configure only; the rate drops once you pass four cameras |
Where those numbers come from, honestly. The last two rows — adding a camera to an existing system, and installing a camera you already own — come from a single Klang Valley operator’s published rate card rather than from a surveyed market, so read them as one installer’s prices rather than as the going rate. The cabling rows are a different problem again. One Klang Valley operator publishes a flat rate of about RM150 per cabling point and does not distinguish concealed work from surface work at all. Nobody in the Malaysian CCTV trade publishes a concealed per-point rate. The concealed band above, the top of the surface band and the drilling charge are therefore taken from a Kuala Lumpur and Selangor electrical contractor’s published point rates — the adjacent trade doing the identical wall-hacking labour, because cutting a chase, laying conduit, re-plastering and testing a point is the same work whether the cable in it carries video or a light switch. So the honest framing is that concealed cabling in a condo is priced like any other concealed point, rather than that the security trade publishes a rate of its own. The same logic sits behind the per-point figures in adding power points and sockets and house rewiring cost.
Two lines are usually missing from a cheap quote and both are real money: making good (plaster, skim and paint back to the existing colour, which almost never matches a wall painted three years ago) and access equipment where a ceiling is high. Ask for both as separate lines rather than discovering them later. The whole-system picture sits on the CCTV installation cost guide.
Before permission, there is physics. Some walls in a high-rise are not decorative partitions and cutting them is not a matter of asking nicely.
The practical result is that in most condos the concealed option, if it happens at all, happens inside your own unit on a non-structural wall, and everything from the front door outwards is surface-run or not run at all.
This is the part people guess at, so here it is in the by-laws’ own words.
In a strata scheme the prescribed by-laws are those in the Third Schedule to the Strata Management (Maintenance and Management) Regulations 2015, and three of them decide whether you may mount a camera. By-law 11 provides that ‘A proprietor shall not change the appearance, colour code and facade to any part on the exterior of his parcel without the prior written approval of the management corporation and, where necessary, the approval of the appropriate authority.’ By-law 29(2) goes further: a proprietor shall not cause or permit ‘any fitting or fixture or any alteration or change to be made to the exterior of his parcel that will affect or change the appearance of the common property or building facade or encroach onto any part of the common property’ without the prior written approval of the management corporation, and it defines building facade to include ‘external windows, balconies, terraces, common areas, open areas and all other visible parts of the building which constitute or form part of the exterior appearance of the building’. By-law 22(2) separately provides that a proprietor shall not ‘drive nails or screws, or fasten brackets or the like into, or otherwise damage or deface, any part of the common property except with the prior written approval of the management corporation’, and adds that such an approval does not authorise any addition to the common property. By by-law 2(1)(a), a reference to the ‘management corporation’ in these by-laws is read as a reference to the joint management body where a JMB is in charge, so the same rules apply in a JMB-managed building. In practice that means a camera mounted inside your own parcel and looking out through your own window raises far fewer issues than a camera bracketed to a corridor wall, a balcony parapet or any other visible part of the building, which needs the management’s written approval first.
Read plainly, that is the whole condo cabling problem: a bracket screwed into a corridor wall, a clip fixed to a lobby ceiling and a hole drilled through into the riser are all fixings into common property, and they need prior written approval first. What your building then decides beyond that is its own affair — the rules for residents’ cameras, camera angles and where a bracket may go are set by your building’s own rules, and condo CCTV rules and your JMB covers them properly. Renovation permits, deposits and working hours are covered in strata renovation rules and what to do when management rejects a renovation. This is general information about the by-laws, not legal advice on your building; a specific dispute needs professional advice.
Management offices refuse vague applications and approve specific ones. Give them a package they can say yes to:
Two things move an application along more than anything else: proposing surface casing rather than chasing, and keeping every camera looking at your own door rather than down the corridor. Angles that sweep a neighbour’s entrance are the most common reason a committee says no, and they are the most common reason a neighbour complains after a yes.
A surveyor is looking for a continuous route from the camera to the recorder that crosses as little common property as possible. In a Klang Valley condo the candidates, in order of preference, are these.
| Route | When it works | What kills it |
|---|---|---|
| Existing false ceiling or bulkhead inside the parcel | Almost always the best route — hidden, reversible, no cutting | A solid skim-coat ceiling with no access hatch anywhere |
| Skirting-level casing along a wall inside the parcel | Neat, cheap, and easy to paint out | Furniture against the wall, and floor-level water in a wet area |
| Through the parcel wall beside the door, straight to the outside face | A short, honest run for a door camera | A structural wall, or a management rule against any external fixing |
| Along the corridor ceiling to a lift lobby position | Only with written approval, and rarely given to a resident | Common property, plus fire-compartment penetrations that need proper sealing |
| Inside the building’s services riser | Effectively never available to a resident | Locked, shared with building services, and off-limits without management’s own contractor |
| Out of a window and along the facade | Never. It changes the exterior appearance | The facade by-law, weather, and a cable no one can maintain safely |
Where a cable does have to cross from one fire compartment to another, the hole is not simply drilled and forgotten — it is sealed back to the rating of the wall it went through. Any contractor who does not raise this on a high-rise is telling you something about the rest of their work.
The recorder is the part everyone forgets to site until the cables are already run. It needs four things: a permanent mains socket, air, physical security and somewhere you can actually reach it. Store cupboards and the top of a wardrobe are the usual homes; the sealed cabinet with no ventilation is the usual mistake, because a recorder that runs hot in a Malaysian flat all year is a recorder with a shortened life.
Put it where a burglar will not find it in ten seconds. A recorder sitting under the television next to the front door is the first thing removed, and with it every recording of the person removing it. If the unit is left empty for long periods, a socket on a circuit you can check remotely is worth more than a tidier position.
If you are adding a socket for it, that is mains work and belongs to an electrician, not to the camera crew — see adding power points and electrician services. Storm damage through that mains feed is a real and underrated failure mode; it is covered in CCTV lightning and surge protection.
Two practical decisions sit inside the cabling line of your quote. The first is what the cable is made of. Cheap patch cable sold as network cable is often copper-clad aluminium rather than solid copper; it is thinner, more brittle, has higher resistance and behaves badly on a long run carrying power. On a job where the cable is buried in a wall or a ceiling void you never want to open again, the cable is the last place to save fifty ringgit. Ask, in writing, for solid copper and the category being installed.
The second is Power over Ethernet. A PoE camera takes its power down the same cable that carries its video, so one run serves one camera and you do not need a separate power point at each position — a large saving in a condo, where every extra hole is another approval. The trade-off is distance and voltage drop: a long run, a thin conductor and a cold joint together starve the camera, and the symptom is a camera that reboots at night when its infrared illuminators draw the most current. That is the same fault pattern described in CCTV going offline when it rains, which is worth reading before you accept a long run.
Almost every condo CCTV enquiry is really about one camera at the entrance door. It is also the position that causes every dispute, so decide three things before anyone drills.
| What you notice | Usual cause | What it costs to put right |
|---|---|---|
| Casing lifting off the wall within a year | Glued to a dusty or painted surface with no mechanical fixings | Small, but the wall now has two sets of holes |
| One camera drops out every evening | Voltage drop on a long or undersized PoE run | Re-pull the cable — the reason cable spec matters at quoting |
| Camera dead after a storm | Surge along the cable, or water at an outdoor joint | Camera or recorder replacement; often both |
| Management letter after the fact | Fixings into common property with no prior written approval | Removal, reinstatement, and a deposit you do not get back |
| Cannot add a fifth camera | No spare conduit and no draw wire left in the concealed run | The concealed rate again, from scratch |
| Neighbour complaint about the angle | A corridor-facing camera nobody agreed to | Re-siting, and a committee that is now unhelpful |
A quote reading “supply and install 4 cameras — RM x” is not comparable with anything and gives you nothing to hold anyone to.
Before the crew leaves, walk the job. Every camera on screen at once, at night as well as in daylight, so an infrared-driven voltage-drop fault shows up. Every trunking run fixed mechanically, not just glued. Every chase filled, sanded and painted, with the leftover paint left behind. Every penetration sealed. Then ask for the handover items in a message you can find again a year later: the recorder’s login and the fact that the default password was changed, the app set up on your phone, the cable routes photographed before the trunking lids went on, and the model numbers of the cameras and the recorder.
Photographs of the open routes are the single most useful thing you can keep. The next contractor — or the plumber who wants to drill that wall — will thank you for them, and so will you when a camera has to be added.
ClickBina wires cameras in Klang Valley condominiums, which means most of our work is a permission problem with a cable attached. We survey the unit before we quote — the ceiling void, the parcel boundary, the recorder position and the mains supply — and we tell you plainly which of your camera positions management is likely to approve and which it is not. Because we do not publish a package price for security work, every job is quoted from what the survey finds rather than from a list. Send us your job details for the door, the corridor and your ceiling, or a floor plan, and we will quote after a site survey. See our electrical and plumbing services for the mains side of the work.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteThis guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:
How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we reply within the hour.