Published package ranges for 4, 8 and 16-camera systems, the five things that actually move your number, and the twelve lines a comparable quote has to carry.
📍 We serve KL, Selangor & Putrajaya.

Start with what is actually advertised. Several Klang Valley installers publish fixed package prices for a branded system — cameras, recorder, a surveillance hard disk and standard cabling, fitted. These are their prices, published on their own websites in 2026, and they are the honest starting point for a budget (market estimate 2026, indicative Klang Valley).
| Item | Market range (2026, Klang Valley) | What that price covers |
|---|---|---|
| 4-camera Hikvision / Dahua, supplied & installed | RM2,599 – RM2,899 per system | cameras, recorder, 1TB surveillance drive, standard cabling and installation |
| 8-camera Hikvision / Dahua, supplied & installed | RM3,099 – RM3,899 per system | cameras, recorder, 2TB surveillance drive, standard cabling and installation |
| 16-camera system, supplied & installed | RM5,899 – RM7,899 per system | the brand you pick moves this band more than the camera count does |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteTwo things to notice before you take those figures anywhere. First, the spread inside a single camera count is large — the brand and the sensor resolution move an 8-camera system more than adding two extra cameras would. Second, every one of those prices assumes a standard installation: short cable runs, accessible mounting heights, an existing power point near the recorder. The moment your cable has to cross the house inside a wall, the package price stops describing your job.
ClickBina does not publish a price for this work, and that is deliberate rather than coy. A CCTV quote is mostly a cabling quote, and cabling cannot be priced from a photograph of a house front. What we can do — and what the rest of this page does — is show you exactly which lines the money sits on, so that when you compare three quotes you are comparing the same job.
The single most common reason two CCTV quotes differ by thousands of ringgit is that they are not quoting the same thing. The market splits into three genuinely different products that all get called “an 8-camera CCTV package”.
Hardware only. A box of cameras, a recorder and a drive. At least one Klang Valley supplier states plainly on its own pricing page that cabling is not included in these tiers (market estimate 2026, indicative Klang Valley for the retail figures below):
| Hardware | Typical Malaysian retail price | What it is |
|---|---|---|
| 4-camera kit, hardware only | RM800 – RM1,500 per kit | cameras, recorder and drive only — cabling and installation are quoted separately |
| 8-camera kit, hardware only | RM1,800 – RM2,499 per kit | cameras, recorder and drive only — cabling and installation are quoted separately |
| 16-camera kit, hardware only | RM4,999 per kit | 16 x 4K cameras with a 4TB drive; cabling and installation are quoted separately |
Consumer kit plus a basic fit. An entry-level DVR or Wi-Fi kit, mounted and configured, often recording to a memory card rather than to a surveillance drive. Add the kit price and the installer’s own mounting charge together and you land around RM950 – RM1,900 per system for four cameras — but note what that figure is: it is not a published package price, it is one operator’s kit band plus the same operator’s installation charge, arithmetic rather than a quote.
Branded, supplied and installed. The packages in the first table. Cameras from a recognised manufacturer, a recorder with a real surveillance drive in it, cabling run by the installer, and one company answerable for the whole thing.
The gap between the first row and the third row is not profiteering. It is the cabling, the labour, the drive and the warranty, and the rest of this page is about how to see it on paper. The “free installation” package priced honestly takes that comparison apart line by line.
In order of how much they typically swing a Klang Valley quote:
| Driver | Why it moves the price | What to decide before you ask for a quote |
|---|---|---|
| Cable route — surface or concealed | Surface trunking is a fast clip-and-go run. Concealed means cutting the wall, laying conduit, re-plastering and making good | Which runs you can live with in white PVC casing, and which ones genuinely have to disappear |
| Number of cable points, not cameras | Two cameras on one wall near the recorder cost far less than two cameras at opposite ends of a corner lot | Where the recorder will live, and how far the furthest camera is from it |
| Recorder channel count and PoE | Channels set your ceiling for the next five years; built-in PoE ports remove a separate injector or switch | The camera count you may reach later, not the count you are buying today |
| Storage | How many days of footage you keep is a hardware decision made on day one, and the drive that comes free in a package is usually the smallest one that works | How long footage has to survive before somebody notices an incident |
| Access and building type | Height, scaffolding, hard walls, a condo riser, management approvals and after-hours working all cost time | Whether anything needs a ladder beyond a normal step ladder, and whether a management office has to approve the work |
Notice what is not on that list: the cameras. Between a decent 2MP camera and a 4MP one there is a real difference in picture, but on a six-camera job it is rarely the line that decides the total. Cable does.
Every camera needs a physical run back to the recorder, and how that run is made is the biggest variable in the whole job. Surface trunking — white PVC casing clipped along a ceiling line or a beam — is quick, cheap, inspectable and easy to alter later. A concealed run is cut into the wall, laid in conduit and plastered over: invisible, permanent, and considerably more labour.
Here is where an honest caveat belongs. No Malaysian CCTV installer we could find publishes a concealed per-point rate. What is published is a Klang Valley electrical contractor’s point rates for the identical wall-hacking labour — cut, conduit, fit, re-plaster, test. So read the concealed row below as “this wall work is priced like any other concealed point”, not as “CCTV installers charge this” (market estimate 2026, indicative Klang Valley):
| Cabling work | Market range (2026, Klang Valley) | What it involves |
|---|---|---|
| Cabling, surface / PVC trunking | RM150 – RM250 per point | cable run in surface casing at accessible heights — the fast, cheap route |
| Cabling, concealed in the wall | RM250 – RM500 per point | wall cut, conduit laid, re-plastered; repainting is normally not included |
| Drilling through brick or concrete | RM50 – RM120 per hole | added where a run has to cross a structural wall |
The practical consequence is simple arithmetic. Six surface points cost RM900 – RM1,500 in cabling; the same six points concealed cost RM1,500 – RM3,000. That is the difference between a tidy job and an invisible one, and it is the single largest choice you make on a domestic CCTV install. Most people end up mixing the two: concealed where the cable would be seen from the living room or the entrance, surface along the back of the house, the roof space and the car porch soffit.
Two more cabling costs get missed. Re-painting after a concealed run is normally not included — the plasterer makes good, the paint is yours. And a run that has to cross a structural wall carries a drilling charge, RM50 – RM120 per hole, which on a corner-lot house with a boundary wall camera can appear three or four times.
This is arithmetic on the published rates above, not a quotation, and it is here so you can redo it with your own numbers. Six cameras on a standard double-storey terrace: front gate, car porch, front door, back door, side lane, upstairs landing. The recorder sits in the store room under the stairs.
| Line | Basis | Range |
|---|---|---|
| Cabling if every run is surface trunking | 6 points x RM150 – RM250 per point | RM900 – RM1,500 |
| Cabling if the four visible runs are concealed instead | 4 concealed + 2 surface | RM1,300 – RM2,500 |
| Two holes through the boundary and party walls | 2 x RM50 – RM120 per hole | RM100 – RM240 |
| Cameras, recorder, drive, configuration | Inside a branded 8-channel package | RM3,099 – RM3,899 per system |
Read that table as a shape rather than a total. An installer quoting a package will normally absorb standard surface cabling into the package price and charge the concealed upgrade and the drilling on top — which is exactly why the two cabling rows are shown separately. If a quote gives you one figure with no cabling method stated, you cannot tell which of those two worlds you are buying.
Note also that six cameras were bought on an eight-channel recorder. That is not padding, it is headroom: adding a seventh camera to a spare channel later is a cabling job, while adding it to a full recorder means a new recorder.
The recorder is the least glamorous box in the system and the one that decides what you can do in three years. Two things matter: how many channels it has, and whether it powers the cameras itself over the network cable. These are one Malaysian retailer’s published supply-only prices for a common brand, re-binned by model number, and they are shelf prices for the box alone — not an installed rate, and no hard disk in any of them:
| Hardware | Typical Malaysian retail price | What it is |
|---|---|---|
| 4-channel NVR | RM388 – RM449 per unit | recorder only — no hard disk in the box |
| 8-channel NVR | RM440 – RM510 per unit | the higher price buys built-in PoE ports |
| 16-channel NVR | RM580 – RM1,600 per unit | PoE ports and the faster chipset drive this band |
| PoE ports on the recorder | RM70 – RM470 per unit | the same channel count with built-in PoE, versus without |
The last row is the one worth understanding. At the same channel count, a recorder with built-in Power-over-Ethernet ports costs more than one without. What you get for it is one cable per camera instead of two — no separate power adaptor at each camera position, no injector, no spare 13A socket up in the eaves. On a job where cameras sit in awkward places, PoE frequently saves more in cabling and power points than the recorder premium costs.
Buy channels you have not filled yet. The difference between an 8-channel and a 16-channel recorder is small next to the cost of replacing a full 8-channel unit when you decide the side gate needs a camera too.
Recording days are not a setting, they are a hardware decision. The drive supplied in a package is normally the smallest one that keeps the system working, and on a multi-camera 4MP system that can mean days rather than weeks of history. Surveillance drives are a retail purchase and Malaysian marketplace prices for them look like this — floors from marketplace listings, not an installed price, and deliberately shown without a ceiling because the listing spread is enormous:
| Hardware | Typical Malaysian retail price | What it is |
|---|---|---|
| 2TB surveillance hard disk | from RM234 per drive | continuous-write drive (WD Purple / Seagate SkyHawk); a desktop drive voids the warranty |
| 4TB surveillance hard disk | from RM420 per drive | what you need once you want a month of footage rather than a week |
Do not read a price-per-terabyte curve into those two rows; marketplace listing prices for these drives do not behave that neatly. The right way to size a drive is arithmetic on your own recorder’s bitrate setting, and how many days your CCTV hard disk will actually hold shows the calculation in full so you can run it before you accept a quote rather than after.
One practical rule: ask what drive is in the quote, in terabytes, and ask what recording days that gives at the resolution being proposed. An installer who can answer that in one sentence has done the sum. One who has not will tell you it records “until it is full”, which is true of every recorder ever made.
Two smaller jobs come up constantly, and both are published rates in the Klang Valley (market estimate 2026, indicative Klang Valley):
| Job | Market range (2026, Klang Valley) | What it covers |
|---|---|---|
| Add one camera to an existing system | RM300 – RM400 per camera | cabling and installation for one more point; the camera itself is on top |
| Install a camera you already own | RM80 – RM150 per camera | mount, aim and configure only; the rate drops once you pass four cameras |
Adding one camera to an existing system is a cabling job plus the camera itself, and the rate assumes there is a free channel on the recorder and a sensible route. Two extra cameras on a spare pair of channels come to RM600 – RM800 in labour and cabling before the cameras. If the recorder is full, the honest answer changes: you are not adding a camera, you are replacing a recorder.
Installing a camera you bought yourself is cheaper still, but be clear what it does and does not include — it is mount, aim and configure, on an existing cable and an existing recorder. If the camera you bought needs its own power supply at a position with no socket, that is an electrical job on top.
A CCTV system runs on very little power, but it still has to be fed from somewhere. In most houses the recorder needs a socket where it lives, and if the store room or the cabinet has none, someone has to add one. That is ordinary electrical work rather than CCTV work — and it is the line most often left off a CCTV quote entirely, then raised on the day.
Our own position on this is simple and worth stating plainly: the mains connection on our installs is done by an Energy Commission-registered electrical contractor. If you are having a socket added for a recorder, or a spur run for a camera power supply, price it as electrical work and ask who is doing it. Adding power points and sockets covers what that costs, and house rewiring cost is the right page if the board and circuits are old enough that this is really a bigger conversation.
The second power question is what happens in an outage. A recorder plugged straight into a socket stops recording the moment the power does. A small uninterruptible supply keeps the recorder and the router alive through a short cut, which is the difference between a gap in the footage and a missing evening. Ask whether one is included; it usually is not.
Every figure on this page is somebody else’s published Malaysian price, collected in August 2026, and it is worth being precise about what that means:
A CCTV quote that says “8 cameras + DVR + installation — RM3,500” is not comparable with anything. Ask for these lines, and compare quotes line by line rather than total by total:
If a quote carries those twelve lines, two quotes can be compared honestly. If it does not, the cheaper one is usually cheaper because something on that list is missing.
| What you see on the quote | Good sign, or padding? | What to ask |
|---|---|---|
| 16-channel recorder for a 6-camera house | Usually sensible headroom, occasionally over-sold | What the extra channels cost versus 8, and whether you realistically want ten more cameras |
| 4K on every position | Often padding | Which positions genuinely need to read a plate or a face — and what 4K on eight channels does to your recording days |
| “Free” 1TB drive on an 8-camera 4MP system | Padding by omission | How many days that actually holds — run the arithmetic before you accept it |
| A single line for cabling with no method stated | The most expensive ambiguity on the page | Which runs are concealed, which are surface, and what happens if a run turns out to be longer than assumed |
| “AI camera” or “smart detection” with no function named | Meaningless until defined | What it detects, whether it runs in the camera or the recorder, and what it does when it triggers |
| Cameras from a brand you cannot find a Malaysian supplier for | A support problem waiting to happen | Who supplies replacement units in two years, and who honours the warranty |
| Everything on one line, one number, one page | Not comparable | The twelve lines above, in writing |
CCTV is not fit-and-forget. Cameras lose focus, spiders build webs across the infrared lens and trigger motion recording all night, cable glands weep after a storm, and a drive that has been writing continuously for four years will eventually fail. One Klang Valley contractor publishes a full maintenance rate card, which is one published card rather than a market — but it is the clearest picture available of what ongoing support costs (market estimate 2026, indicative Klang Valley):
| Maintenance | One published Klang Valley rate card (2026) | What it includes |
|---|---|---|
| Ad-hoc service call | RM150 – RM250 per visit | diagnosis, realignment and configuration; replacement parts are charged on top |
| Maintenance, 1–5 cameras | RM150 per visit | one scheduled service a year; parts are charged separately |
| Maintenance contract, 6–30 cameras | RM240 per month | twelve services a year, labour only — parts are charged separately |
| Maintenance contract, 30–90 cameras | RM800 per month | twelve services a year with parts and labour included |
For a domestic system the realistic pattern is a service call when something stops working, plus a drive replacement somewhere in the system’s life. For a shop, an office or a JMB, a contract makes more sense — the cameras that matter are the ones that were working on the day something happened, and nobody checks a camera they are not paid to check.
Whatever you choose, ask now rather than later: who holds the admin password, who is allowed to export footage, and how quickly someone attends when a camera drops off. Those three answers are worth more than a warranty certificate.
We could publish a package price. We would then either have to load it enough to cover the worst cabling route in the Klang Valley, or revise it upward on the day when the run turns out to be concealed across two rooms. Both are worse for you than a survey.
What the survey is actually for: walking the route each cable has to take, finding where the recorder can live near power and network, checking mounting heights and what needs a ladder, identifying which walls are structural, and agreeing which runs you want hidden. That is a half-hour on site and it turns a guess into a fixed number. ClickBina works across Kuala Lumpur and Selangor, and the mains connection on our installs is done by an Energy Commission-registered electrical contractor. See our full electrical and plumbing services, or send your job details for each camera position and where you want the recorder, and we will tell you what the job involves before anyone quotes it.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteThis guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:
How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we reply within the hour.