Choosing CCTV cameras for your home or shop? Here is what each camera shape is good at, and which choices really change what you see.
📍 We serve KL, Selangor & Putrajaya.

Dome, bullet, turret and PTZ describe a CCTV camera's body, not its quality. Domes suit ceilings and places where a camera may be knocked or tampered with; bullets suit long views along a side lane or a driveway and are an obvious deterrent; turrets (eyeball cameras) are the easy all-rounder for eaves and walls; PTZ cameras pan, tilt and zoom and belong on large sites with someone watching, not on most homes. The choices that matter more are the lens (fixed or varifocal) and a resolution matched to each position. Adding one camera to an existing system is published at RM300 – RM400 per camera for cabling and installation, with the camera itself on top.
Walk into any CCTV shop and the cameras sort into a handful of shapes. The shape decides where a camera mounts, how easy it is to aim, how obvious it looks and how well it stands up to knocks and weather. It does not, on its own, decide how sharp the image is.
| Type | What it looks like | Best at | Weak spot |
|---|---|---|---|
| Dome | Camera inside a clear or smoked bubble, flush base | Ceilings, porches, shops, places within reach | Bubble can reflect infrared at night if dirty or scratched; harder to re-aim |
| Bullet | Tube-shaped body on a bracket, often with a sun hood | Long, narrow views: side lanes, driveways, perimeter walls | Obvious target; spiders and birds like the hood |
| Turret (eyeball) | Ball-shaped camera in a socket, no bubble | General all-round use on eaves and walls | Within reach it can be knocked off aim |
| PTZ | Motorised camera that pans, tilts and zooms | Large sites with an operator: car parks, compounds | Only sees one direction at a time; costs more; moving parts |
Other shapes exist: box cameras with a separate lens, fisheye cameras that see a whole room from the ceiling, and small consumer Wi-Fi cameras. Our Wi-Fi camera vs professional CCTV guide covers the last group, which records to a memory card rather than a recorder.
A dome hides the camera under a bubble, so it is hard to see which way it points. That makes it a good choice for a porch ceiling, a shop, a lift lobby or anywhere a passer-by could reach it: vandal-rated domes are built to take a knock. The trade-offs are practical. Aiming a dome means opening it, and at night the infrared light can bounce off a dusty or scratched bubble and wash out the image, so the bubble needs cleaning and careful fitting. Domes are the natural choice for ceilings and less natural for a long view down a wall.
A bullet camera is the classic tube on an arm. It is easy to aim at a long, narrow scene such as a side lane or a driveway, and its shape tells anyone approaching that the property is watched. The sun hood keeps rain and glare off the glass. Its weaknesses are that it is an obvious target, and that spiders, wasps and birds make homes on and under the hood; a web across the lens at night can trigger motion recording all night. Mount bullets high enough to be out of reach.
A turret camera sits in a ball-and-socket mount with no bubble in front of the lens. That avoids the dome's night-time reflection problem, and the ball swivels easily for aiming. It mounts neatly under eaves, on walls or on ceilings and suits most home positions. It is a little easier to knock off aim than a dome if it is within reach, so it belongs above head height.
A PTZ (pan-tilt-zoom) camera turns and zooms on command or on a patrol pattern. It is useful where one operator watches a large area, such as a factory yard, a car park or a guardhouse gate, and wants to zoom in on something happening. On a home it is usually the wrong tool: while it is pointing one way it records nothing the other way, and it costs more than a fixed camera. Two or three fixed cameras covering the same ground normally record more of what matters, all the time.
The comparison people search most is a PTZ camera against a bullet or dome camera. The difference is not image quality but coverage: a fixed camera records the same view all the time, while a PTZ records only where it is pointing.
| PTZ camera | Bullet camera | Dome camera | |
|---|---|---|---|
| Coverage | Pans, tilts and zooms; one direction at a time | One fixed view, best for long narrow scenes | One fixed view, often from a ceiling |
| Suits | Large sites with an operator: car parks, factory yards, guardhouse gates | Side lanes, driveways, perimeter walls | Porches, shops, lift lobbies, places within reach |
| Recording | Misses what happens elsewhere while it points one way | Records its whole scene continuously | Records its whole scene continuously |
| Trade-off | Costs more than a fixed camera; moving parts | Obvious target; spiders and birds like the hood | Bubble must be kept clean to avoid night-time reflection |
For a home, two or three fixed cameras covering the same ground usually record more of what matters than one PTZ. On a large compound, the usual layout is fixed cameras recording everything plus one PTZ that the guard uses to follow events.
The lens decides what a camera sees. A wide fixed lens shows a lot of the scene but makes a face or a plate small; a narrower view shows less but in more detail. A varifocal lens can be adjusted during installation to frame exactly the area you want, which is useful at a gate or an entrance where you need to recognise a person rather than just see that someone was there. A good quotation states the camera type per position, including whether each one has a fixed lens or a varifocal lens, and whether it is indoor or weather-rated.
Our CCTV installation cost guide is honest about resolution: between a decent 2MP camera and a 4MP one there is a real difference in the image, but on a six-camera job it is rarely the line that decides the total. The bigger cost is on the hard disk. More pixels mean more data every second from every camera, and the recorder holds a fixed amount, so putting 4K on every position shortens how many days of footage you keep.
The sensible way to specify resolution is position by position. The gate, the front door and anywhere you need to read a plate or recognise a face earn the extra pixels; a camera that only needs to show whether someone walked down a corridor does not. Our hard disk recording days guide shows how to work out the days of footage for your mix.
Every one of these shapes comes in versions that see in the dark using infrared, which gives a black and white image, and versions that stay in colour using a small white light or a very sensitive sensor. Which one suits each position is a separate decision from the camera's shape, and worth asking about for positions that face a dark lane or a garden. Mounting matters too: infrared from a camera aimed at a nearby wall or eave bounces back and blinds it.
| Position | Usual choice | Why |
|---|---|---|
| Main gate / driveway | Bullet or turret, varifocal, higher resolution | Long view; you want faces and plates |
| Porch and front door ceiling | Dome or turret | Ceiling mount, within reach of visitors |
| Side lane / back lane | Bullet or turret | Narrow, long scene along a wall |
| Back door / kitchen yard | Turret | Short view, easy to aim under the eave |
| Inside the house | Small dome or turret | Discreet, ceiling or high wall |
| Shop floor / counter | Dome, or fisheye for a whole room | Tamper-resistant, wide coverage |
| Large compound with a guard | Fixed cameras plus one PTZ | Fixed cameras record everything; PTZ follows events |
Condo owners also need to check what the management allows on corridors and common areas; our condo CCTV rules guide explains the limits.
For a shop, office or factory, the shape follows the same rules as at home, with tampering and coverage weighing more:
A turret is the easy all-rounder above head height and avoids the dome’s night-time reflection; within reach, a dome is harder to knock off aim. Whatever the mix, the quotation should state the camera type, the lens and whether it is weather-rated for each position.
These are the published ranges on ClickBina guides (indicative 2026, Klang Valley). They depend far more on cabling and access than on whether the camera is a dome or a bullet.
| Item | Indicative price | Source guide |
|---|---|---|
| Branded 4-camera system, supplied and installed | RM2,599 – RM2,899 per system | CCTV installation cost guide |
| Add one camera to an existing system (camera on top) | RM300 – RM400 per camera | CCTV installation cost guide |
| Install a camera you already own | RM80 – RM150 per camera | CCTV installation cost guide |
| Consumer Wi-Fi camera, hardware only | RM99 – RM899 per camera | Wi-Fi camera vs professional CCTV guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteA dome and a bullet from the same range usually cost about the same. What moves the price is the resolution, the lens, whether the recorder has a spare channel, and how far each cable has to run.
CCTV work is quoted case by case. WhatsApp us your job details for a quote: landed or condo, the positions you want covered, whether you already have a recorder and how many channels are spare, and whether you need to recognise faces or plates at the gate. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are indicative Klang Valley market ranges for 2026, not fixed rates. Camera shapes are described generically; no brand is ranked.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.