Drips under the metal roof on dry mornings? It may be condensation, not a leak. Here is how to tell and what fixes it.
📍 We serve KL, Selangor & Putrajaya.

If a metal roof drips on dry, humid mornings and stops once the sun is up, it is usually condensation, not a leak: warm, moist air meets the underside of a sheet that has cooled overnight, and water forms and drips along the purlins and screw lines. A leak drips when it rains, at particular points. Sealant on the laps will not stop condensation; an insulation or underlay layer under the sheet, ventilation and less moist air below will. ClickBina's roof insulation guide puts adding foil or sarking during a re-roof at RM1.50 – RM3.00 per sq ft (indicative 2026, Klang Valley).
A bare metal sheet loses heat quickly to a clear night sky. By early morning its underside can be colder than the air below it. In our humid climate that air holds a lot of moisture, and when it touches the cold sheet, the moisture turns into droplets, exactly like the outside of a glass of iced water. The droplets run along the sheet and fall from the lowest points: the purlins, the screw heads and the edges of the laps.
ClickBina's roof insulation guide makes the same point: if a ceiling or metal roof is dripping on dry, humid mornings, it may be condensation rather than a leak. The same thing happens in warehouses; the warehouse metal roof guide describes an uninsulated roof that drips on its own underside on humid mornings.
| Clue | Points to condensation | Points to a leak |
|---|---|---|
| When it drips | Dry, humid mornings, often after a clear night | During or just after rain |
| When it stops | Mid-morning, as the sun warms the roof | When the rain stops and the roof drains |
| Where it drips | Spread along purlins, screw lines and laps | At particular points: a lap, a fastener, a flashing |
| What the underside looks like | Beads of water across a wide area of sheet | A wet trail running from one entry point |
| Wind-driven rain | No effect | Worse in storms from one direction |
| Rust pattern | General surface rust on the underside | Rust concentrated around holes, laps or fixings |
The two can happen together. An old roof can leak at a lap and sweat everywhere else, so fixing one does not rule out the other.
For walls and ceilings, ClickBina's condensation vs water seepage guide explains the tape and foil test, which answers the same question in a different place.
Condensation needs one of two things to stop: the underside of the sheet must stay warmer, or there must be less moist air touching it. In practice:
These are ClickBina's published ranges (indicative 2026, Klang Valley). PU foam and rockwool are quoted per house, because the area and access decide the price.
| Work | Indicative price | Source guide |
|---|---|---|
| Adding foil or sarking when re-roofing | RM1.50 – RM3.00 per sq ft (on top of the re-roof) | Roof insulation guide |
| Metal roof rust-seal and reflective coating | RM5 – RM10 per sq ft | Roof insulation guide |
| Re-screw and new bonded washers (if they have failed) | RM500 – RM1,200 | Metal roof leak repair guide |
| Leak detection, if a real leak is suspected | RM300 – RM800 | Roof insulation guide (charged separately) |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteA coating on top deals with rust and heat on the outer face; it is not a fix for water forming on the underside. If the roof also leaks, ClickBina's metal roof leak repair guide covers the repair ladder.
Condensation is not harmless just because it is not a leak. Water sitting on the underside every morning rusts the sheet from below, where nobody looks, and wets purlins, ceilings and anything stored underneath. Over time it stains plaster, feeds mould and shortens the life of the roof. Catching it early, and fixing the cause rather than the symptom, is cheaper than replacing sheets later. It also stops you paying for leak repairs on a roof that was never leaking in the first place.
WhatsApp us your job details for a quote: what kind of roof it is, what is underneath, and when it drips. If a genuine leak is suspected, leak detection is a separate paid visit at RM300 – RM800. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We reply within the hour, and the price we agree is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.