Water and wiring meet at the light: make it safe, then find where the water is really coming from.
📍 We serve KL, Selangor & Putrajaya.

If water is coming out of a light fitting or downlight, switch that lighting circuit off at the DB box (or the main switch if you are not sure which), touch nothing wet, put a pail under the drip and leave the circuit off until the ceiling has dried and the circuit has been checked. The light is only where the water found a way out: the source is above it, usually a bathroom, an aircon drain, a pipe or the roof. ClickBina's leak detection is a separate paid visit at RM300 – RM800 (2026, Klang Valley). A site visit for a wider renovation job is free.
ClickBina's emergency electrician guide lists water dripping onto the DB board, a socket or a light as a genuine emergency: main switch off, touch nothing wet, and leave it off. The heavy-rain roof leak guide says the same for any water near a ceiling light or fan, calling water meeting live wiring the one genuinely dangerous part of a leak.
A plaster or board ceiling is flat and almost watertight, so water that reaches the top of it spreads out and looks for the nearest hole. A downlight or a ceiling light point is exactly that: a round cut-out in the board with a cable running through it. That is why the light is often the first place a leak shows, before any stain appears.
It also means the leak can be some distance from the light. Water runs along the top of the ceiling board, along the aircon trunking or along a pipe before it finds the opening, so the source is not always directly above the fitting.
| What is above the light | Likely source | Clue |
|---|---|---|
| A bathroom (the unit or floor above) | Slab seepage through the floor trap, a pipe penetration or a failed membrane | Drips after someone showers upstairs |
| An aircon indoor unit or its trunking | Condensate drain blocked or disconnected | Drips while the aircon is running; clear water |
| A water pipe run | A supply pipe or joint leaking | Drips all the time, whether or not anything is in use |
| The roof, on the top floor or a landed house | Tiles, flashing, a valley gutter or a flat roof | Drips only when it rains, sometimes a day later |
The aircon leak or pipe leak guide explains how to tell these apart from where the stain sits and when it drips, and notes that an aircon drip often emerges at the trunking's lowest elbow or at a downlight along its route. Note the time, the weather and what was in use each time it drips; those facts do most of the diagnosis.
A ceiling that sags or bulges around the light is holding water, and the weight of that water can bring a section of board down. The roof leak guide's advice is to put a bucket underneath and pierce the bulge with a screwdriver to drain it in a controlled stream: a small drained hole is far cheaper to repair than a collapsed ceiling. Only do this with the lighting circuit off and away from the light fitting itself.
The guide to how a plaster ceiling is held up explains why wet boards and rusted hangers are what bring ceilings down.
Once water has been inside a light fitting, the fitting, its driver and the cable joints above it may be damp or corroded. The safe order is: stop the water, let the ceiling void dry, then have the circuit checked before it is switched on again. If the RCCB tripped when the water arrived, that is the protection doing its job; do not keep resetting it while the ceiling is still wet.
Checking and reconnecting a circuit is work for a registered electrician. The electrical safety inspection guide explains what an inspection looks at. A light that has had water inside it is usually replaced rather than dried out, because its driver sits in the same space the water ran through.
Doing it in any other order wastes money. A ceiling repainted before the leak is stopped stains again, and a new light fitted into a wet ceiling can fail within weeks.
If the water is coming from the unit above, the source is in someone else's home. The upstairs bathroom leak guide explains how an inter-floor leak is reported to the management, how the source is established, and who pays for which part of the repair. Keep a record of each drip with the date and time while it is happening; it is the evidence that settles the question.
These are the published ClickBina figures (2026, Klang Valley), each from the guide named beside it:
| Item | Indicative price | Source guide |
|---|---|---|
| Leak detection (ClickBina), if the source is hidden | RM300 – RM800 per visit, separate | After-storm inspection checklist |
| Aircon drain clearing or chemical wash | RM130 – RM280 | Aircon leak or pipe leak guide |
| Trace and repair or re-route a leaking pipe | RM300 – RM1,500+ | Aircon leak or pipe leak guide |
| Electrical fault-finding diagnosis | RM150 – RM400 | Emergency electrician guide |
| Swap a light fitting | RM60 – RM200 | Emergency electrician guide |
WhatsApp us your job details for a quote — we reply within the hour.
A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.
💬 WhatsApp for a quoteThe source decides most of the bill. A blocked aircon drain is a small job; a failed bathroom membrane upstairs is a waterproofing job, which the waterproofing services page covers.
WhatsApp us your job details for a quote: which room, what is above the ceiling there, and whether the drip follows rain, the aircon or someone showering upstairs. Where the source is hidden, our leak detection is a separate paid visit at RM300 – RM800. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the source repair, the ceiling and the repaint are sequenced in the right order. We reply within the hour, and the price agreed is a flat price with no hidden charges.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each. Electrical checks and reconnection are for a registered electrician.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.