Water that sits after a shower or runs to the door: find the cause first, then fix it once.
📍 We serve KL, Selangor & Putrajaya.

A bathroom floor ponds for one of two reasons: the water cannot get away (a slow, blocked or badly set floor trap), or the floor does not slope towards the trap (wrong falls in the screed). A bucket test tells them apart in five minutes. A slow trap is cleared; ClickBina's guides put a floor-trap or shower blockage at RM120 – RM350 (market estimate 2026, Klang Valley). Wrong falls are set in the screed under the tiles, so the only real fix is to lift the tiles, re-lay the screed to fall to the trap, renew the waterproofing and re-tile; no coating creates a fall. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
A bathroom floor is not flat. Under the tiles is a layer of screed that the tiler shapes so the whole floor falls gently towards the floor trap. Water should run to the trap and leave nothing standing. The bathroom defects guide puts it simply: if water sits, or heads for the door, the falls are wrong, and no amount of waterproofing above will cure it.
Ponding is more than a nuisance. Standing water keeps the grout wet, so mould grows in the joints; it is a slip hazard for children and older people; and water that sits on a floor for hours keeps pushing at every weak joint, so a small grout crack becomes a stain on the ceiling below far sooner than on a floor that drains.
Before anyone quotes for hacking, find out which problem you have. Clear the floor, then:
The wet kitchen floor guide uses the same test: on a floor with proper falls the water travels visibly to the trap and is gone within seconds. If the water reaches the trap quickly but the trap itself is slow, the drain is the problem. If the water never reaches the trap, the floor is.
| Cause | What you see | Usual fix |
|---|---|---|
| Slow or partly blocked trap | Water reaches the trap but drains slowly; gurgling | Clear the trap and the pipe below it |
| Trap set too high | A ring of water around the trap, which sits proud of the tiles | Reset the trap, re-tile around it |
| Falls set the wrong way | Water runs to the door or a far corner instead of the trap | Re-screed to fall to the trap |
| Local dip or uneven tiles | One or two small puddles in the same spots every time | Lift and re-lay those tiles, or re-screed |
| Kerb or threshold holding water | Water collects along the screen line or the door step | Re-detail the threshold with the screed |
More than one cause can apply. A floor with weak falls may have coped for years until the trap began to slow down; clearing the trap may be enough to bring it back.
Hair, soap scum and sand build up in the trap and the pipe below it. The water still gets away, just slowly enough to stand on the floor while the shower runs. The blocked drain guide covers clearing it; it is the cheapest fix and the first one to try.
A trap set too high is a construction fault: the trap body was fixed before the screed and ended up proud of the finished tiles, so water stops just short of it. That means lifting the tiles around the trap, resetting it at the right level and re-tiling the patch. The waterproofing must be dressed into the new trap body. A badly sealed trap is also a common leak path, explained in the floor trap leak guide.
If the bucket test shows water running away from the trap, the screed was laid flat or sloping the wrong way. This is common where a bathroom was re-tiled straight over old tiles, where a trap was moved without re-shaping the floor, or where large tiles were laid on a base that was not prepared for them. The bathroom re-tiling guide notes that smaller floor tiles make the fall to the trap easier to form, while large tiles need a flatter base and more careful cutting around the trap.
Falls are set in the screed, before waterproofing and tiling. The floor screed guide explains why: self-levelling compound finds its own level, so it cannot form the slope a bathroom floor needs.
Some quotations offer to fix ponding with a coating over the tiles. A coating follows the surface it is applied to; it can fill shallow low spots, but it does not change the direction the floor slopes. The epoxy flake guide is clear that an epoxy floor does not change the slope, and the wet kitchen floor guide says the same of liquid membranes. Use a coating for what it does well, a new non-slip surface on a floor that already drains.
Be wary of a quote that jumps to step four without a bucket test, and of one that offers a coating for a floor that runs the wrong way.
A re-screed is a small bathroom renovation. The sequence matters:
Because the membrane is exposed once the tiles are up, a re-screed is the right time to renew it. The wet/dry bathroom layout guide explains why a stronger fall inside the shower area, with the dry area almost level, keeps the rest of the floor dry.
If you collected the keys recently, ponding is a defect for the developer to correct. The bathroom defects guide notes the defect liability period runs 24 months from vacant possession. Describe it precisely, for example: shower area, water poured at the far corner stands and does not reach the floor trap; please correct the floor falls. The proper repair is re-laying the screed, not a thicker bead of silicone at the door.
ClickBina's published guides give these figures (indicative 2026, Klang Valley); a re-screed is quoted after the bucket test, because the area and what is under the tiles decide the price:
| Work | Indicative price | Source guide |
|---|---|---|
| Clearing a floor-trap or shower blockage | RM120 – RM350 | Blocked drain guide |
| Regrouting a standard bathroom (falls fine) | RM300 – RM800 | Bathroom re-tiling guide |
| Hacking and disposing of old tiles | RM3 – RM6 per sq ft | Bathroom re-tiling guide |
| New tiles supplied and laid | RM10 – RM18 per sq ft ceramic, RM18 – RM35 porcelain | Bathroom re-tiling guide |
| Full hack-and-redo waterproofing | RM4,500 – RM9,000 | Toilet waterproofing guide |
| Leak detection, if the ceiling below is stained (separate) | RM300 – RM800 per visit | Bathroom defects guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteWhatsApp us your job details for a quote: where the water sits, how long it stays, and whether the ceiling below is stained. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, and handles defect inspection and rectification, so the drain, screed, waterproofing and tiling can be planned in the right order as one job. We reply within the hour, and the price agreed is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. See also step-free shower conversion.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each. No gradient or tolerance is quoted, because none is published on the pages above.